MRP Wizard, Step 3: Item Selection
Use this window to select items for the MRP run.
This topic documents fields and other elements in this window that either are not self-explanatory or require additional information. End of the note. |
Includes all items with the
For a parent item of a bill of materials (BOM), all the child items in the BOM chain are included in the MRP run, regardless of their End of the note. |
Includes selected items in the MRP run. To do so, proceed as follows:
If you have added an item and then deselected it in an MRP run, the next time you run this scenario, you can still see the item displayed in the table, deselected. This way you can include this item in the MRP run by selecting it. If you removed this item from an MRP run, the next time you run this scenario, you are not able to view it in the selected items table. If you want to include it in the MRP run, you have to add it again. End of the note. |
Select items to be included in the MRP run. Choose the button to open the If required, select the |
Removes all the items selected and displayed in the table. |
Select or deselect all the items displayed in the table. |
Select to open the
The following parameters of the items can be updated according to the method you choose:
The updated value applies to all the items involved in the current scenario and MRP run. Your change here does not affect the item-specific definition on the Item Master Data: Planning Data Tab. |
Saves the MRP scenario at the current stage. Available only when you add a new scenario or update an existing one.
You cannot save an MRP scenario if it is a simulation. End of the note. |