Show TOC

Function documentationBill of Materials Locate this document in the navigation structure

 

Use the Define Bill of Materials function to create a multilevel BOM, one level at a time.

The BOM has a hierarchical arrangement of components. Enter all the child items and raw materials required to assemble and produce the finished product.

To open the Bill of Materials window, choose   Production   Bill of Materials  .