Show TOC

10000390 Locate this document in the navigation structure

Message

Date range deviates from declared period

Diagnosis

You are in the 349 Report — Selected Criteria window. You have specified dates in the Date From...To... fields, and a period in the Declared Period and Year fields, but at least one of the dates you specified deviates from the declared period.

Example Example

End of the example.

You have specified 01/01/07 in the Date From fields, Year in the Declared Period field and 2008 in the Year field. Since the start date is earlier than the specified declared period, SAP Business One cannot generate the 349 report.

Procedure

In the Date From...To... fields, specify a date range within the declared period.