Creating and Opening a Control PlanTo create a control plan, you are on the Control Plans
screen.
To open a control plan, you are pn the Control Plans
screen or in a project on the Control Plans
tab.
You created a control plan template, if required (see Creating a Project Template).
On the Control Plans
screen, select the project for which you want to create a control plan.
Only those projects are displayed whose project type allows the use of control plans.
Enter a number for the new control plan.
Note
The system checks whether the number has been assigned yet.
Select a template if required.
Note
You can only use templates with the status Released
.
Choose Create
.
Edit the control plan (see Editing a Control Plan).
Save your entries.
To open an existing control plan, click the control plan number in the control plan overview for a project.