Example documentationExample: Process Flow Change

 

You originally chose the item type Product Concept as the best process flow for your project. Now you realize that the decision points available do not adequately fit your process. You would like to change to the item type New Product Development, as it has decision points that better suit your requirements. Within the current item type, the active decision point is Specify.

Prerequisites

You have made the following settings in Customizing for SAP Portfolio and Project Management in Start of the navigation path Portfolio Management Next navigation step Global Customizing Next navigation step Portfolio Independent Settings Next navigation step Define Portfolio Item Types End of the navigation path.

Item Type

Decision Points

Permitted Item Types for Switching To

Permitted Item Types for Switching To

Product Concept

Ideate (0001)

New Product Development

Product Improvement

Specify (0002)

New Product Development

Design (0003)

New Product Development

Develop (0004)

New Product Development

New Product Development

Ideatione (A)

Product Concept

Product Improvement

Specification (B)

Product Concept

Design (C)

Product Concept

Development (D)

Product Concept

Testing (E)

Ramp Up Phase (F)

Maintenance (G)

Product Improvement

Ideate

Product Concept

New Product Development

Design

Correct

Ship

Maintain

The system evaluates which new items can be switched to from Product Concept, based on these settings you have made in Customizing, and also on the status of the decision points in the current item. Mapping is available between the status of the decision points of the two different item types, and also between the status of the two different item types themselves.

In the table above, all the decision points for Product Concept match the decision points of the New Product Development item type . Regardless of which decision point is active for Product Concept, a change to the New Product Development item type is possible.

Note Note

If you want to change to the Product Improvement item type instead, you can see in the table above, that only the first decision point matches. Therefore, a change to Product Improvement is only possible if the current decision point has not passed Ideate. If the current decision point has already passed Ideate, then the item decision points must be manually reverted back to Ideate to switch to the Product Improvement item type.

End of the note.

Process

  1. On the Item Details screen, the Phases and Decision dashboard displays the existing decision points for the Product Concept item type, as shown here:

    Decision Point Name

    ID

    Status

    Status Grouping

    Ideate

    0001

    Closed

    Closed

    Specify

    0002

    Design

    0003

    Released

    Active

    Develop

    0004

    In Preparation

    Created/Not Started

    You choose the Change Process pushbutton to open the Change Process screen. You choose the new item type New Product Development from the list.

  2. You choose whether the system renames the previous decision points, or deletes them (including all assigned information) and creates new ones.

    You select Rename previous decision points, and the new decision points are as follows:

    Decision Point

    ID

    Status

    Status Grouping

    Comment

    Ideation

    A

    Finished

    Closed

    Update

    Specification

    B

    Update

    Design

    C

    Active

    Active

    Update

    Development

    D

    Set Up

    Created/Not Started

    Update

    Testing

    E

    Creation

    Ramp Up

    F

    Creation

    Maintenance

    G

    Creation

    Note Note

    If you had selected Delete previous decision points, the new decision points would be as follows:

    Decision Point

    ID

    Status

    Status Grouping

    Comment

    Ideation

    A

    Finished

    Closed

    Update

    Specification

    B

    Update

    Design

    C

    Active

    Active

    Update

    Development

    D

    Creation (Deletion of old decision Point 0004)

    Testing

    E

    Creation

    Ramp Up

    F

    Creation

    Maintenance

    G

    Creation

    End of the note.
  3. The new item type New Product Development has more decision points than Product Concept, so the additional decision points are added. From the configuration tables described in the Customizing activity Make Settings for the Status Mapping For Items, the system determines the status of the new decision points.