Methodology used to identify potential errors early on in development and prevent them using suitable measures.
The following fields from FMEA are available in cProjects:
· Severity: Severity of the consequences of errors
· Detection: Probability of the detection of errors
· Occurrence: Probability of the occurrence of errors
Here you can enter values between 1 (no risk) and 10 (high risk). The product of these values is the risk priority number, on which the actual risk calculation is based. The higher the risk priority number, the more important it is to correct the cause of the error(s).