Start of Content Area

Procedure documentation Creating an Object Link  Locate the document in its SAP Library structure

Use

You can create object links to existing objects and other cProjects projects. If the object you want to link to does not exist, you can plan a link and link to the object at a later point in time.

Special Characteristics of the Quality Notification (QM) Object Type

If you want to create a link to a quality notification, you can create a new notification in the SAP system directly from cProjects and link it to a project element. To do this, choose the object type Quality Notification (QM) (Creation Optional). If the notification type you enter requires an external number assignment, you have to enter a number. If the notification type does not permit external number assignment, the system assigns the number automatically and you cannot enter it manually.

Note

You can use the OLR3_NOTIFICATION BAdI to specify that certain data, for example, the number or the notification type is assigned automatically. The BAdI can be found in the SAP system in Customizing for Integration with Other SAP Components under BAdI: Creating a QM Notification.

Prerequisites

You opened a project, task, or checklist item from the Projects, Tasks, or Checklist Items initial view and are on the Object Links tab page (see also Opening a Project or Project Version).

Procedure

Note

Depending on the settings made by your system administrator, the automatic existence check and the search function may not be available.

Creating an Object Link to an Existing Object

...

       1.      In the structure tree navigate to the project element for which you want to create an object link.

       2.      Choose Create.

       3.      Under Link to, select the object type you want to link to.

       4.      Enter the data of the object.

       5.      Do not set the Identify Object Later indicator.

       6.      Enter a name, if required.

If you do not enter a name, the system transfers the name of the linked object during the existence check.

       7.      Choose Continue.

The system checks whether the object you entered exists in the source system and then creates the link. You can edit the linked object.

       8.      Save the project.

Planning an object link to an object that does not exist yet

...

       1.      In the structure tree navigate to the project element for which you want to create an object link.

       2.      Choose Create.

       3.      Under Link to, select the object type you want to link to.

       4.      Set the Identify Object Later indicator.

The system does not carry out an existence check in the source system of the object. The system carries out the check once you have entered the identification.

       5.      Enter a name, if required.

If you do not enter a name, the system transfers the name of the linked object later on during the existence check.

       6.      Leave the remaining fields blank.

       7.      Choose Continue.

The system plans the object link and marks it as Object has not been identified. You can edit the link later on (see Editing an Object Link).

       8.      Save the project.

 

End of Content Area