Show TOC

Process documentationConfiguring a Process Integration Scenario Locate this document in the navigation structure

 

You must configure the scenario before you can execute it.

This section contains an overview of the necessary configuration steps.

For detailed instructions of how to configure this process integration scenario (for the SAP standard configuration), see the separate configuration guide(see General Configuration Steps).

Prerequisites

Before you configure this process integration scenario, you must execute general configuration steps (for example, set up the System Landscape Directory, generate the appropriate flight data). For details, see General Configuration Steps.

Process

Configuration Steps

You can configure the process integration scenario for one file system or for multiple file systems.

  • If you are interested in the functions of the file/FTP adapter, it is sufficient to configure one file system.

  • If you are interested in exchanging messages with multiple receivers, you must configure multiple file systems.

Define a suitable communication component in the Integration Directory for each file system. Create a communication channel with the adapter type File for each of these communication components. In the communication channel, define how the file/FTP adapter is to process an inbound message. for example, file directory, file name, and file format (XML format or CSV format (Comma Separated Values)).

To configure the message exchange, you need a receiver determination as well as an interface determination and a receiver agreement for each receiver.

For more information, see the configuration guide for the demo examples.

Once you have finished, do not forget to activate all change lists containing changes that you made during configuration.