Show TOC

Background documentationModeling Defaults and Specials Locate this document in the navigation structure

 

Control Size of Flow Objects While Creating

If you create flow objects with the speed buttons, the flow objects are created in a standard size. It is the same if you create flow objects by selecting the flow object from the palette and click into the process canvas.

You can control the size of the flow object, if you select the flow object from palette, drag it into the process canvas and draw it in the desired size.

Modeling Drafts of Processes Without Error Messages

There are two ways to model processes without getting warnings and error messages:

  • Model the process in an inactive pool.

    To make the pool inactive, select the pool in the process canvas, and in the pool's Properties tab, deselect the Make this pool active (other pool become inactive) option.

    We recommend to choose this way.

  • Deactivate the automatic built.

    To deactivate the automatic built, in the Project menu, deselect the Build Automatically function.

    We do not recommend to deactivate the automatic built because problems can occur while importing WSDL files.