Create Activity Necessity ViewLocate this document in the navigation structure

Prerequisites

You have generated a Project IMG.

Context

SAP distinguishes between:

  • Mandatory activities

  • Optional activities

  • Not required activities.

Each activity can be critical or uncritical. Critical Customizing activities need care because errors here can have major consequences (unlike errors with uncritical Customizing activities). You should check your entries here carefully.

Mandatory activities

Mandatory activities

SAP cannot supply a full set of standard settings for mandatory activities. You must perform these Customizing activities before you can use the SAP System.

Optional activities

Optional activities

Optional activity Customizing settings have SAP defaults, but you should check them, and change them if necessary.

Not required activities

Not required activities

Not required activities have SAP defaults which are valid for the SAP standard system.

Procedure


  1. Choose the Project Views tab in the project for which you want to create a view.

  2. Click on the Create Project View icon below the list of existing views.

  3. Enter a meaningful project view name in the Create New View dialog box.

  4. Select the Activity Necessity selection criterion.

  5. Choose Continue and confirm the following information with Continue again.

  6. Select the project view attributes.

  7. Save the view data with the Save symbol below the attribute selection.

  8. Confirm if the view IMG is to be created or not by choosing Yes.

Results

The project view IMG is generated. To display the project view IMG, click on the Display View IMG pushbutton under the list of existing views.

To assign a generated project view to a project member, choose the Assign View to Users pushbutton below the list of existing views.