You can display the Implementation Guide in various forms:
As the SAP Reference IMG
To display the SAP Reference IMG, choose Project Administration in the SAP menu
orand then
Display SAP Reference IMG pushbutton.
or choose theAs a Project IMG
There are two ways to display a Project IMG:
From Perform Project
Select the project you want to display in your Customizing worklist, and choose Display Project below the list.
From Project Management
Select the project which you want to display, in the project overview, and choose Display Project below the project overview.
or chooseThe project management data is displayed on tabs.
Choose Display Project IMG pushbutton.
or theThe screen and the display functions described below differ depending on whether you display the IMG with or without Tree Control. You can change the display type in the Perform Project or Project Management initial screen under .
For more infromation, see Customizing Settings.
Expanding and Collapsing the Hierarchy Structure
Display IMG without Tree Control:
A plus sign before a structure node in the hierarchy structure indicates that there are additional structure nodes on lower levels. By clicking the plus sign, you expand all nodes of the next level.
A minus sign before a structure node in the hierarchy structure indicates that all structure nodes on lower levels have been expanded. By clicking the minus sign, you hide all nodes of the lower levels.
Display IMG with Tree Control:
The plus and minus signs are replaced by a triangle which points to the right if there are further structure nodes, or down if the structure is already expanded.
Text Display
You can specify whether want the IMG documentation displayed in SAP script or HTML format with . This setting overrides the text display standard setting.
For more information about displaying the Implementation Guide, see Additional IMG Displays.