Prerequisites
The data collection method has been started once manually.
Procedure
- Call the SAPconnect monitor.
- Expand the monitor tree completely.
- Position the cursor on a node in the level directly below the client.
Note
You can also schedule the method on higher-level nodes (for example, a client or the monitor). However, this has no effect on the lower-level nodes.
- Choose
Properties and switch from display to change mode.
You receive notification that the values of the MTE class will be changed.
- Confirm the dialog box.
- On the
Methods tab page, in the
Start Data Collection Method Every.. field, specify the interval (in seconds) between automatic starts of the method.
- Save the dialog.
Results
The SAPconnect data collection method is scheduled.