Show TOC

 Scheduler Tasks ReportLocate this document in the navigation structure

Use

The report lists all scheduler tasks that are entered in the Knowledge Management configuration.

In a load balancing environment, you can use the report to redistribute scheduler tasks to other system nodes. For example, this can be required in the following cases:

  • A system node needs to be removed from operations for maintenance
  • A system node is down due to errors

 

Features

The report results display the following information about the scheduler tasks:

  • Description(description of the scheduler task)
  • Priority (Specifies the priority for the running of the scheduling task)
  • Systems (Displays which systems the scheduler task is run on)
  • Status (Displays whether the scheduler task is active)

This information is read from the configuration for the scheduler tasks.

 

You can make the following settings for this report.

Commands tab

Command Description

Transfer to Cluster System

You can use this function to move the selected scheduler task to a different system node.

Add to Cluster System

You can use this function to assign the selected scheduler task additionally to another system node.

For example, this is possible for reports that your company has written and which can be run on more than one CM system. To find out whether a scheduler task can be run on more than one CM system, see the corresponding documentation for the scheduler task.

Remove from Cluster System

You can use this function to delete the selected scheduler task from a cluster node.

You must specify the system node ID for each of these commands.

Once a command has been executed, you can find the corresponding report result in the report directory. The action that was executed is listed on the Executed tab page.

 

See also:

Scheduler Tasks