Show TOC

Setting Retention Periods (BC-SRV-ARL)Locate this document in the navigation structure

Setting Retention Periods (BC-SRV-ARL)

  1. Choose Links, and enter the required retention period in months in the field Retention period.
  2. Choose Tools → Business Documents → Miscellaneous → Stored Documents → Stored documents → Expiry date → Change
  3. Enter the required business object.
  4. Enter the corresponding document type.
  5. Specify whether or not it is a test run.
  6. If it is a test run, a list of all the link entries with the newly calculated expiry date is displayed.

    To change the expiry date, you need administration authorization for ArchiveLink (see Authorizations).

  7. Choose Program → Execute.

A message confirming that the deletion date has been re-calculated is displayed.