SAP Multiresource Scheduling
Software Components for SAP Multiresource Scheduling
Resource Planning Execution
Master Data
SAP Multiresource Scheduling Master Data
Resource Planning Structure
Qualification Catalog
Creation of a Qualification Catalog
Searching and Editing a Qualification Catalog
Using Filters for Qualification Catalogs
Qualification Matrix
Creating and Editing a Qualification Matrix
Employee Profile
Creating and Editing an Employee Profile
Editing Several Employee Profiles
Status of Employee Profiles
Approval Workflow for Employee Profiles
Requirements Profile
Creating and Editing a Requirements Profile
Data Transfer
Copying Qualification Catalogs from SAP HR
Copying Structured Qualifications from SAP HR
Availability Transfer Between SAP HR and SAP Multiresource Sched
Resource Planning for an Order
Scheduler Workplace
Workplace Functions
User-Specific Configuration
Order Worklist
Item Worklist
Detailed View for Demand
Planning Board
Display of the Current Time
Resource-List Filter and Extension
Detailed View for Assignment
Table-Based Planning
Display of Geographical Information
Day-Based Scheduling
Alert Monitor
Cross-Area Functions in Resource Planning
Calling the Scheduler Workplace by Work Priority
Manager Planning Board
Planning Horizon
Adjustment of Planning Horizon for Resources
Undo or Redo Actions
Data Consistency and Locks
Checks and Alerts
Checks
Automatic Save
Cross-Resource Functions
Creating Assignments
Time Allocations
Processing Planning Board Elements
Creation of Change Documents for Planning Board Objects
Addition of Resources
Assignment of Personnel Resources
Demand-Based Resource Selection in the Planning Board
Functions for Standard Qualifications
Functions for SAP Multiresource Scheduling Qualifications
Qualification Matching for Structured Qualifications
Qualification Matching for Unstructured Qualifications
Extended Search with Adjacent Level Matching
Adjacent-Level Matching
Employee Search
Employee Search for a Demand and Free Employee Search
Employee Search for On-Call Types
Demand Search in the Planning Board and Global Demand Search
Results Display for Employee and Demand Search
Results Display in Detail
Creating Capacitive Assignments
Displaying Capacitive Assignments
Totals Bars in the Planning Row
Stretched Assignments
Partial Concretization of Stretched Assignments in Non-Availabil
Inclusion of Travel Times
Alternative Working Times
Availability Determination
Assigning Demands to Other Resource Planning Nodes
Assignment Split
Recalculation of Splits
Assignment Copy
Plan for Multiple Resources for a Demand
Cutting Out of Assignments
Display of Dependencies Between Assignments
Displaying Collisions in the Planning Board
Teams
Team Maintenance Report
Demand Split
Creation of Change Documents for Demand Splits
Utilization of Personnel Resources
Intelligent Shift of Assignments
Optimizer for Resource Planning
Calling Optimization from the Planning Board
Optimization in the Background
Resource Planning for Resources from Different Time Zones
Site Supervisor Indicator
Notes on Integrating Mobile Devices
Person Responsible in the Team
Assignment of Tools
Links
Planning of Production Resources/Tools (PRTs)
Resource Planning with Collaboration Projects
Creation of an SAP Multiresource Scheduling Demand in the cProje
Process Variant Overview for Contact Person Process
Process Variant Overview for Resource Planner Process
Use of HR Qualifications in cProjects
Resource Proposal Processing in cProject
Status Overview in cProjects
Demand Closure in the Contact Person Process
Resource Planning for a CRM Service Order
Progress Monitoring
Use of Multiple Back-End Systems
Data Integration from Multiple Back-End Systems
Information About Operations
Capacity Graphs
Copyright
Important Disclaimers on Legal Aspects