| yield (MFG-ME) |
The ratio of acceptable units produced at an operation to the number of units started at that operation.
A planned yield is the scheduled yield.
An actual yield is the yield actually achieved on the shop floor.
The reject rate (also called the scrap factor) is the inverse of yield.
If both are expressed as decimals, reject rate plus yield equals 1.