Show TOC

 Quantity Structure Control in Joint Production Locate this document in the navigation structure

Use

The quantity structure to be costed is determined by data from the material master.

Features

To determine the quantity structure for costing co-products, enter one of the following parameters in the material master:

  • A production version with BOM and routing entries

  • A production version that refers to a leading co-product or a process material

Note Note

This link enables you to cost a co-product from the quantity structure of another leading co-product. This ensures that when you cost this co-product, costing is carried out using the BOM and routing of the leading co-product.

The costing lot size is dependent on the costing lot size of the leading co-product and the component quantity in the BOM.

 ( )

If no entries were made in the material master of the co-product, the system attempts to determine the quantity structure through the quantity structure determination of the costing variant. It first attempts to determine the quantity structure via valid production versions.

End of the note.

See also:

For further information, see Determination of Quantity Structure and Quantity Structure Determination Using the Material Master Record .