Show TOC

 Reprocessing Confirmations Locate this document in the navigation structure

Use

Prior to release 4.6A, this procedure was used exclusively for reprocessing PDC error records.

Procedure

  1. Choose   Logistics   Production   Shop floor control   Confirmation   Reprocessing   Confirmations.  

  2. Enter the selection criteria for the confirmations that you want to process.

  3. Choose  ( ) .

  4. To remove the errors, if possible, correct the confirmations accordingly.

  5. To post the processed confirmation, choose  ( ) .

Note Note

All selected confirmations are processed when you save. If you want to process a confirmation at a later stage, choose  ( ) to delete it from the list  ( ) .

End of the note.