 Taking Further Requirement Types into Account Locate this document in the navigation structure

Use

This function enables you to specify which other requirement types are to be taken into account in the kanban calculation in addition to the dependent requirements that are already assigned to a production supply area (PSA). The transaction Consideration of Requirement Types (PKDIS) is available for this purpose.

You must define a quota arrangement for the assignment of the requirements to the various PSAs.

Features

The transaction Consideration of Further Requirements is subdivided into two views:

  • Consideration of Further Requirement Types

    In this area, you can specify a combination of material, plant, and storage location and specify additional requirements that are to be taken into account in the kanban calculation for this combination. You can choose the following further requirement types:

    • Planned independent requirements

      If you set the indicator, the system also takes the planned independent requirements that exist for the material you specified into account in the kanban calculation.

      Note Note

      Because a planned independent requirement is not specified with reference to a storage location, SAP recommends specifying material and plant and entering * for the storage location. The entry is then valid across storage locations.

      If you are using MRP areas, the planned independent requirements are assigned to the receiving storage location of the MRP area. In this case, you should specify this receiving storage location.

      End of the note.
    • Customer requirements

    • Stock transfer requirements

      These include all releases against stock transport requisitions, stock transport orders, stock transport planned orders, and stock transport scheduling agreement schedule lines.

    • Unassigned dependent requirements

      These are dependent requirements that are not assigned to a PSA. This option also enables dependent requirements without a PSA assignment to be taken into account in the kanban calculation in quota-allocated form. You define the quota arrangement in the Distribution of Requirements to PSAs view.

  • Distribution of Requirements to PSAs

    In this view, you can assign the requirements to one or more PSAs. For the PSA, you can check whether control cycles yet exist for the combination of material and PSA.

    In addition, the system displays a traffic light for each PSA. The traffic light indicates the existence and LCM status of the associated control cycle:

    • A red traffic light means that no control cycle has yet been created for the combination.

    • A yellow traffic light means that the control cycle still has the status In Creation and is thus not included in the kanban calculation.

    • A green traffic light shows that a created or released control cycle exists for this combination and the kanban calculation can be performed without any problems.

Activities

  1. To select additional requirement types, choose   Kanban Calculation   Consideration of Requirement Types   from the Kanban menu.

    The Consideration of Further Requirement Types: Overview s creen appears.

  2. Choose New Entries .

  3. Specify material , plant and storage location . If the entry is to be valid on a cross-storage-location basis, enter *.

  4. Select the checkbox for the desired requirement type .

  5. Double-click on Distribution of Requirements to PSAs .

    The system shows the table for distribution of the requirements to the PSAs.

  6. To assign PSAs, choose New Entries .

  7. If you want to adopt already existing PSA assignments of the material, choose the Adopt Existing PSAs for Material pushbutton.

    The system displays the existing PSAs.

  8. You can choose one or more PSAs.

    The system then enters the selected PSA(s) in the table.

  9. Specify a weighting for the distribution for each PSA. With the weighting, you specify the distribution of the requirements among the existing PSAs. The distribution is carried out for all requirement types that you selected in the first step of this activity.

  10. Save your input.

Example

Material A is made available in the three production supply areas PSA1, PSA2, and PSA3. You have selected further requirements. These are to be distributed among the PSAs in accordance with your weighting.

For PSA1, you therefore specify the weighting 2 . For PSAs 2 and 3, you specify the weighting 1 . This causes 50% of all requirements for material A, which you selected in the first step, to be assigned to PSA1. PSA2 and PSA3 are each assigned 25% of the requirements.