 Changing Routings Locate this document in the navigation structure

Use

You use this procedure to change the data of individual routings.

If you want to change objects in several or all of you routings, you should use one of the following procedures:

Changing Work Centers (Mass Changes)

Replacing PRTs (Mass Changes)

Prerequisites

The following data already exists in the system:

  • The source (routing)

  • If you want to maintain the routing with history : The corresponding change master record.

    (See SAP Library LO Engineering Change Management , Maintaining Change Master Records )

  • If you want to link the routing with a revision level : The relevant revision level of the material to be produced.

    See SAP Library LO Engineering Change Management, Assigning a Revision Level to a Material)

Procedure

  1. In the SAP menu choose   Logistics   Production   Master Data   Routings   .

  2. Choose   Routing   Change.  

    Note: In the following procedure the task list type Routing is referred to, primarily in menu paths. The same paths are also valid for the other task list types (reference operation sets, rate routings and reference rate routings). If you want to maintain such an object choose the <task list type> instead of Routing .

  3. Enter the relevant data on the initial screen.

  4. Choose Enter .

    The screen that then appears depends on the group you entered.

    If there

    you reach the

    is only one routing in the group

    operation overview for this routing

    are several routings in the group

    header overview

  5. The further procedure depends on which data you want to change or enter. For information, refer to

    Editing Hea der Da t a

    Editing Operations and Sub-operations

    Editing Material Components