You can change the control information displayed in an existing PI sheet if this information was defined in the process instruction using the characteristic PPPI_INSTRUCTION.
The change is only relevant for the PI sheet. It has no effect on the process order from which the PI sheet was created.
See: Changing Control Information in ABAP List-Based PI Sheets .