To display scheduling results, select the menu options
You see the following data:
basic start and finish dates
scheduled start and finish dates
in-house production time from the material master record
scheduled in-house production time
Note
If you select Update mat. master , the assembly scrap determined by the system is also written to the temporary file.
For additional information about updating the material master, refer to the section Transferring Scheduling Results to a Material Master Record .