 Scheduling Results Locate this document in the navigation structure

To display scheduling results, select the menu options   Extras   Scheduling   Results   .  

You see the following data:

  • basic start and finish dates

  • scheduled start and finish dates

  • in-house production time from the material master record

  • scheduled in-house production time

Note Note

If you select Update mat. master , the assembly scrap determined by the system is also written to the temporary file.

For additional information about updating the material master, refer to the section Transferring Scheduling Results to a Material Master Record .

End of the note.