( )
E1SAFKL
Field |
Description |
Type |
Length |
AUFNR |
Run schedule header number |
char |
12 |
ALNAG |
This key together with a (task list) group uniquely identifies a task list (rate-based planning) |
char |
2 |
APLAL |
This key together with a (task list) group uniquely identifies a task list (detailed planning) |
char |
2 |
ALORT |
Storage location where the material is stored during confirmation in repetitive manufacturing |
char |
4 |
ARBID |
Internal number used together with the object type to identify the operating resource |
numc |
8 |
BSTMA |
Upper limit of the lot size range |
quan |
14 |
BSTMI |
Lower limit of the lot size range |
quan |
14 |
DISLS |
Key specifying the lot size method that the system uses to calculate the quantity to be procured or produced in materials planning |
char |
2 |
DISPO |
Number of the MRP controller or MRP controller group of the run schedule header |
char |
3 |
ENDAY |
End of the validity period for the run schedule header |
dats |
8 |
GAMNG |
Total run schedule header quantity |
quan |
14 |
GASMG |
Total scrap quantity of the order |
quan |
14 |
GMEIN |
Unit of measure in which the material stocks are managed |
unit |
3 |
KTEXT |
Description of the run schedule header |
char |
40 |
MATNR |
Material number in the run schedule header |
char |
18 |
MDV01 |
Work center name or name of the line where the run schedule header is processed |
char |
8 |
MDV02 |
Work center name or name of the line where the run schedule header is processed |
char |
8 |
PERIO |
Indicator specifying the period lengths into which the run schedule header is to be divided |
char |
1 |
PLNNG |
Key of the (task list) group (rate-based planning) |
char |
8 |
PLNNR |
Key of the (task list) group (detailed planning) |
char |
8 |
PLNTY |
Key distinguishing task lists by their functionality (detailed planning) |
char |
1 |
PLTYG |
Key distinguishing task lists by their functionality (rate-based planning) |
char |
1 |
RGEKZ |
Indicates that backflush is permitted for run schedule headers |
char |
1 |
STDAY |
Start of the validity period for the run schedule header |
dats |
8 |
STLAL |
Bill of material alternative |
char |
2 |
STLAN |
Specifies the enterprise area in which the bill of material can be used |
char |
1 |
VERID |
Production version |
char |
4 |
VERTO |
Key specifying how the production quantities are distributed in partial quantities among the duration of a planned or production order. Specifies the relationship between time and output quantity |
char |
4 |
WERKS |
Key uniquely identifying a plant |
char |
4 |
E1PZPSL
Field |
Description |
Type |
Length |
PLNFL |
Sequence of operations with a task list |
char |
6 |
VORNE |
Number uniquely identifying the reporting point |
char |
4 |
AUFAK |
Planned scrap in percent |
dec |
7 |
LMVRG |
Quantity confirmed at a reporting point |
quan |
15 |
MEINH |
Operation unit of measure |
unit |
3 |
PLNME |
Unit of measure of the material to be produced in the task list |
unit |
3 |
UMREN |
Denominator for converting to base units of measure |
dec |
7 |
UMREZ |
Numerator for converting to base units of measure |
dec |
7 |
XMVRG |
Scrap confirmed at a reporting point |
quan |
15 |