  Check and Adopt Automatic Kanban Calculation Locate this document in the navigation structure

Procedure

Invoking the Result List
  1. From the Kanban menu, choose   Control Cycle   Kanban Calculation   Check Proposal.  

    The initial screen for the evaluation and adoption of the kanban calculation for the circulation data in the control cycle appears.

  2. Enter the plant in which you want to check the kanban calculation.

  3. Enter the desired selection criteria according to your requirements. If you need more criteria for selection than are provided on the initial screen, choose Extended Selection .

  4. You can also limit the selection of the calculated circulation data by entering tolerance values for the current control cycle data. The system then only offers the control cycles that deviate from the current data according to your stipulations.

  5. Choose Enter .

    The overview screen for checking and adopting the kanban calculation appears. For more information on the result list, see Checking and Adopting the Calculation Results

Adopt Result

You have the following options to adopt the result:

  1. You can adopt the kanban circulation data for individual control cycles.

    To do this, select one or more rows and choose   Edit   Adopt   Next Change   For Selected.  

  2. You can adopt the kanban circulation data for all control cycles selected in the overview.

    To do so, choose   Edit   Adopt   Next Change   For All   .

  3. You can adopt the calculated number of kanbans or the calculated quantity for all control cycles whose change date lies before a date you selected.

    To do so, choose   Edit   Adopt   Next Change   For Change to   .

    A dialog box appears, in which you can enter the desired date.

  4. Instead of the calculated default value, you can adopt a default value that you can choose yourself. You can enter a value for the next quantity or next number of kanbans in the corresponding field that is ready to accept input. When you save, this value is then adopted.

    If you Choose Continue before saving, the change proposals are adopted in the first two columns for the next quantity or for the next number of kanban containers and the calculated values flagged for adoption.

    Note Note

    When you save, the old data of the control cycle is immediately overwritten. The change thus does not only become effective as of the first calculated change date. Therefore, it is advisable to carry out the checking and adoption at regular intervals and to use the change date as the selection criterion.

    End of the note.
Cancel Adoption

You can cancel the adoption of the data provided that it has not yet been saved.

To do so, choose   Edit   Delete Copied Data   All or Selected.