 Allowing Material Price Determination Locate this document in the navigation structure

Procedure

  1. Choose   Accounting   Controlling   Product Cost Controlling   Actual Costing/Material Ledger   Actual Costing   Edit Costing Run.  

  2. Under Process , go to either Single-level or Multilevel material price determination .

  3. Double-click on the padlock symbol to allow material price determination.

Result

For the plant you selected, you can perform single-level and multilevel material price determination as well as closing entries in the period entered.

Note

Note Note

  If you want to perform single-level material price determination when postprocessing outside of the costing run, you can use the following menu path to check whether price determination is allowed:   Accounting   Controlling   Product Cost Controlling   Actual Costing/Material Ledger   Periodic Material Valuation   Organizational Measures   Display Allowed Tasks  

End of the note.

See also:

Performing Single-Level Material Price Determination

Performing Multilevel Price Determination