Show TOC

 Unlocking Reference Operation Sets/Reference Rate Routings Locate this document in the navigation structure

Procedure

  1. In the operation overview of the routing select an operation of the referenced reference operation set (or reference rate routing)

  2. Choose   Extras   Reference   Unlock   .  

Result

The system copies the operations from the reference operation set (or reference rate routing) to the routing (or rate routing). You can now maintain them as normal operations.