 Creating a Costing Run Locate this document in the navigation structure

Procedure

  1. Choose   Accounting   Controlling   Product Cost Controlling   Actual Costing/Material Ledger   Actual Costing   Edit Costing Run   then   Costing Run   Create   .

    Alternatively, you can copy an existing costing run. In this case, choose   Costing Run   Copy.   When you do this, the plants from the costing run being copied are transferred into the new costing run. You can manually change the assignment of plants.

  2. Enter the necessary data and choose Execute .

  3. Under General Data , assign the relevant plants to the costing run.

  4. Save the costing run.

Result

You see a list of the plants that are contained in the costing run plus information telling you which plants can participate and which plants can not participate.

Next, select the materials.

See also:

Performing a Selection