Show TOC

 Reduction of Floats Before and After Production Locate this document in the navigation structure

Floats before and after production are used to compensate for interruptions in the production process. To reduce the floats before and after production in non order-related scheduling, on the dialog box Scheduling , enter the percentage by which the floats should be reduced at each reduction level.