Show TOC

 Postprocess Backlogs via List Locate this document in the navigation structure

Use

When postprocessing backlogs from backflushing, you can use this function to generate a list of components for to be postprocessed.

Prerequisites

You have set the generation of postprocessing records in the repetitive manufacturing profile.

Procedure

  1. From the SAP menu, choose   Logistics   Production   Repetitive Manufacturing   Data Entry   Postprocess   Postprocessing List.  

    The Postprocessing List for Components on Line: Initial Screen appears.

  2. Enter the selection criteria and choose Execute .

    A list appears showing all assemblies corresponding to the selection criteria and for which there are components to be postprocessed. Inter alia, this list is sorted by production line, assembly, and production version.

  3. In the results list, you can perform the following functions:

    • Postprocess Postprocessing Records

    • Change Postprocessing Records

    • Delete Postprocessing Records

    •  ( ) Delete Postprocessing Items

    •  ( ) Display Stock Overview

  4. Make your changes and save the data.