When you access the planning table, the production quantities are ready for input.
Select the figure in the desired number block by double-clicking on it.
If the production quantity consists of several run schedule quantities, the system displays a dialog box where you select the planned order you want to change.
A dialog box appears with the detailed information of the order you selected.
On the details screen, now overwrite the quantity and choose Continue .
You are returned to the planning table and the system has adopted the changed quantity specification. However, the system only makes the changes as a simulation.
Save your data.
The system does not update the database with the changes until you save the data.