 Assigning Work Centers to Subsystems Locate this document in the navigation structure

Prerequisites

You can transfer work center data to a subsystem (external application) for plant data collection (PDC) by entering the subsystem within work center maintenance.

Procedure

  1. From the Basic Data screen in the work center choose   Extras   Subsystem link   .

  2. The dialog box Subsystem grouping is displayed .

  3. Enter the subsystems to which the work center data should be sent.