You can use this process to configure SAP ME to communicate with SAP ERP.
You have executed the SAPMEINTCTC configuration wizard.
You verify that the following is configured in SAP ME:
Site that matches an existing SAP ERP plant (see Site Maintenance)
MESYS user assigned to the SYSTEM user group (see User Maintenance)
The following system rule settings (see System Rule Maintenance)
Specific BOM Component Version Required set to false
ERP Integration Active set to true
Track Production set to true
Track Resource Time set to Yes - Track Idle Time
The following system properties (see System Setup Maintenance)
erp.basicAuth.user set to MESYS
erp.basicAuth.password set to <MESYS password>
erp.mii.webClient.poolSize set to 50
The following custom data fields, values for which are populated when IDocs come from SAP ERP and the corresponding SAPMEINT messages are sent from SAP MII to SAP ME (see Custom Data Maintenance)
Custom Data Category |
Custom Data Field |
Comment |
---|---|---|
Material |
STORAGE_LOCATION |
|
BOM |
ERP_MATERIAL |
|
Routing Step (Operation) |
|
|
Routing |
|
|
Resource |
MEASUREMENT_POINT |
|
Tool Number |
MEASUREMENT_POINT |
The operator must enter correct values for ERP Equipment Number and MEASUREMENT_POINT for the tool to report the tool’s status change to SAP ERP. |
User |
ERP_USER |
|
NC Code |
|
The operator must enter the correct values for these custom data fields when an NC code is created. |
Reason Code |
COST_CENTER |
The operator must enter value for this custom data field for the reason code starting with RTN- or SCR- to clear the floor stock reservations in SAP ERP. |
Collaboration links and directives (see Configuring SAP ME Outbound Collaboration)
In Activity Maintenance, you retrieve Pack/Unpack (PK020) and set values for the following integration-related activity rules to send container close confirmations to SAP ERP (see Transfer of Production Yield Confirmation):
ERP_ITEM_FILTER
ERP_OPERATION
ERP_REPORTING_STEP
ERP_SEQUENCE
For more information about these activity rules, see Pack/Unpack.
You create and configure a data type for floor stock integration as follows:
In Data Field Definition Maintenance, you create the following data fields:
CENTRAL_STORAGE_LOCATION
BATCH_NUMBER (necessary for batch-managed materials)
In Data Field Assignment Maintenance, you assign the following data fields to the ERP_INV_DATA data type of the Assembly category:
CENTRAL_STORAGE_LOCATION
BATCH_NUMBER
VENDOR_LOT
VENDOR_DATE_CODE
VENDOR
You add ERP_INV_DATA as Data to Collect on Floor Stock Receipt on the Build tab page of Material Maintenance for inventory IDs initially received in SAP ME via the floor stock IDoc.
Note
Make sure that the VENDOR value, which is included in the INVCON02 IDoc, exists in SAP ME, before transferring the INVCON02 IDoc to SAP ME. This vendor must be configured in SAP ME to receive and consume the material for which the inventory is received.
For more information, see Transfer of Floor Stock Data.
In Reason Code Maintenance, you create reason codes for clearing floor stock reservations.
The reason codes must begin with the following prefixes to trigger the collaboration event COLLABORATION_ERP_INV_CLEAR_RESERVATION:
RTN-
used for return to floor stock
SCR-
used for scrap
For more information, see Transfer of Floor Stock Return and Scrap Data.