  Creating Production Versions with a Reference Locate this document in the navigation structure

Prerequisites

When you create a material master record specifying a reference material and reference plant, the system proposes the production version(s) from the reference material. However, the production versions are adopted only after you have checked them by choosing ProdVersions .

The production versions are proposed only if the Propose field cont. indicator is set for the field MARC_MKAL. It is not set in the standard system. You can check whether this is the case in Customizing for the Material Master in Assign Fields to Field Selection Groups .

Procedure

  1. On the MRP , Work Scheduling , or Costing screen, choose ProdVersions .

    The Production Version Overview dialog box appears.

  2. Change the data as required and save your changes.