Show TOC

Procedure documentationUsing Worklists Locate this document in the navigation structure

 

Worklists enable you to quickly access data that you frequently need. Examples of such data include material cost estimates, services, and internal activities. You can structure the worklist so that it best suits your purposes.

The worklist consists of containers to which you add the items you require. You can have containers with all item categories (Item category-independent) or certain item categories only (Item category-dependent).

Information in the container of a worklist, such as material cost estimates or base planning objects, can be:

  • Dragged into the costing structure or the list screen of the unit cost estimate

  • Displayed by double-clicking in the Detail List screen area

Prerequisites

You are in the Multilevel Unit Costing screen. You can reach this screen by either of the following menu paths:

  •   Accounting   Controlling   Product Cost Controlling   Product Cost Planning   Material Costing   Cost Estimate Without Quantity Structure   Edit Multilevel  

    or

  •   Accounting   Controlling   Product Cost Controlling   Product Cost Planning   Reference and Simulation Costing   Edit Multilevel  .

Procedure

  1. Choose Worklists On to display the Worklist screen area.

  2. In the Worklist screen area, choose Create Worklist (Create Worklist) to create a worklist.

    Enter the name, and specify the following:

    • Whether only you should be able to access the worklist, or all users

    • Whether the worklist should contain more than one container or only one container with items of a certain category

  3. To add an item to a container, position the cursor on the container and choose Select with the right mouse button.

    To delete an item from a container, use the right mouse button and choose Delete item.

  4. To display the costing items, double-click on the relevant cost estimate in the worklist.

    If you are displaying material cost estimates without quantity structure and base planning objects, the List Screen of the Unit Cost Estimate appears. If you are displaying material cost estimates, the detail screen of the cost estimate appears.

    For more information, see Analyzing the Results and Displaying Material Cost Estimates.

  5. In the Worklist screen area, you can do the following:

    • To convert a container to a worklist, choose   Container... (Container...)   Convert Container to Worklist  .

    • To insert a container into a worklist, choose   Container... (Container...)   Insert Container  .

      Enter a name for the container and specify whether all items or only items of a certain category are to be included in the container.

    • To delete a container, choose   Container... (Container...)   Delete Container  .

    • To copy one worklist into another, choose Copy Worklist (Copy Worklist).

    • To rename the currently displayed worklist, choose Rename Worklist (Rename Worklist).

    • To save the displayed or edited worklist, choose Save Worklist (Save Worklist).

    • To delete the currently displayed worklist, choose Delete Worklist (Delete Worklist).

Result

You can display up to three worklists. To do this, choose Worklist from the list field and confirm with Open Worklist (Open Worklist).

The worklists are displayed as tabs. For the heading of the tab, the name of the worklist and one of the symbols Worklist 1 (Worklist 1), Worklist 2 (Worklist 2) or Worklist 3 (Worklist 3) is shown. By using Move worklist (Move worklist) and Move worklist (Move worklist), you can rearrange the tab pages as desired.

After creating a worklist, you can use the data for Multilevel Unit Costing. To insert an existing cost estimate or item from the worklist into the costing structure or list screen of the unit cost estimate, place the cursor on the item in the worklist and drag it.

Note Note

If you transfer a material cost estimate, you can choose whether it is transferred as the original or as a copy.

End of the note.

Note Note

This feature is only of limited use for base planning objects. For example, you cannot insert a material cost estimate into a base planning object.

End of the note.