Function documentationManual Planning Locate this document in the navigation structure

 

When planning you want to identify the expected costs for the selected period. Manual planning allows you to plan costs based on the level of output required. You can plan activity types, statistical key figures, and costs using the appropriate planning techniques. For more information, see Techniques for Supporting Manual Planning.

Integration

In addition to manual planning in the Cost Center Accounting (CO-OM-CCA) application component, manual planning is implemented in the following application components:

Application Component

Information

Overhead Cost Orders (CO_OM_OPA)

Primary Cost and Revenue Planning

Internal Orders (CO-OM-OPA)

Manual Planning

Activity-Based Costing (CO_OM_ABC)

Manual Process Planning

Real Estate Management (RE)

Cost and Revenue Planning on Real Estate Objects

Project System (PS)

Manual Cost Planning in the Work Breakdown Structure

Prerequisites

User-Defined Planning Layouts (Report Painter)

If you want to use the SAP GUI-based planning layouts, you have defined the planning layouts in Customizing under   Controlling   Cost Center Accounting   Planning   Manual Planning   User-Defined Planning Layouts  .

BW Integrated Planning

If you want to use BW Integrated Planning, you have installed SAP NetWeaver Business Client software and you have access to the role Internal Controller (SAP_CO_INTERNAL_CONTROLLER).

You have enabled the following:

Web Dynpro Application Configurations
  • Cost Element Planning (Basic) (FCOM_IP_CC_COSTELEM01)

  • Top-Down Primary Cost Planning (Basic) (FCOM_IP_CC_COSTELEM03)

  • Cost Element Planning Activity Input (FCOM_IP_CC_COSTELEM05)

  • Activity Output and Price Planning (FCOM_IP_CC_ACTOUTPUT01)

Queries

The following queries are required for cost element planning:

  • Cost Centers: Cost Element Planning Primary by Year (/ERP/COOM_A21_IRQ0002)

  • Cost Centers: Cost Element Planning Primary by Period (/ERP/COOM_A22_IRQ0002)

  • Cost Centers: Top-Down CE Primary Cost Planning by Year (/ERP/COOM_A21_IRQ0013)

  • Cost Centers: Top Down Primary Planning by Period (/ERP/COOM_A22_IRQ0011)

  • Cost Center: Cost Element Secondary Cost Planning by Year (/ERP/COOM_A21_IRQ0003)

  • Cost Center: Cost Element Planning Primary by Period (/ERP/COOM_A22_IRQ0003)

  • Cost Center: Activity Input Planning Activity Independent (/ERP/COOM_A23_IRQ0001)

  • Cost Centers: Activity Input Planning by Period Act. Independ (/ERP/COOM_A24_IRQ0001)

The following queries are required for activity output and price planning:

  • Cost Centers: Activity Type Planning by Years (/ERP/COOM_A25_IRQ0001)

  • Cost Centers: Activity Type Output Planning by Periods (/ERP/COOM_A26_IRQ0001)

  • Cost Centers: Activity Type Price Planning by Periods (/ERP/COOM_A26_IRQ0002)

  • Cost Centers: Activity Type Output Price Planning by Periods (/ERP/COOM_A26_IRQ0003)

  • Cost Center: Acty Type Output Price Plng by Periods in Row (/ERP/COOM_A26_IRQ0004)

The following queries are required for reporting on the plan data by comparison with the relevant reference data:

  • Cost Center: Cost Element Plan/Actual Comparison (/ERP/COOM_A21_Q0001)

  • Cost Center: Activity Input Plan/Actual Comparison (/ERP/COOM_A22_Q0001)

  • Cost Center: Cost Element Plan/Actual Comparison (/ERP/COOM_A22_Q0002)

Features

Planning Levels and Areas

Manual planning operates on one planning level. The planning level determines which key figures and characteristics are available for planning and a planning level contains characteristics and key figures from a planning area. The planning area determines the level of detail available for planning.

Manual planning covers the following planning areas:

Planner Profiles and Planning Layouts

In the standard system, SAP provides planner profiles and planning layouts for the relevant planning area. For more information, see Structuring the Planning Screen. You can either use these profiles and layouts as they stand, or adapt them to meet your own requirements.