 Creating Production Campaigns Locate this document in the navigation structure

Prerequisites

The data for the fixed lot size and the takt time should be maintained in the master data ( MRP 1 view) of the material to be produced in the campaign if you want to use this data for campaign management. You can still change this data in the campaign.

To generate planned orders for the campaign, a material requirements planning run should be carried out. You can also still create planned orders from the campaign.

For settlement using business processes, these planned orders must be created along with the associated business process group.See Business Processes

Procedure

In the SAP menu, choose Logistics Production - Process Production Campaign and then Production Campaign Create.

The Create Production Campaign screen appears.

Enter the following data:

A description for the campaign

A campaign number, if required, for external number assignment that is allowed

The material that is to be produced with this campaign

The plant in which the material is to be produced

A production version for the material, if required

You can also make further entries or changes in the next screen

Validity start and validity finish for the campaign

The total quantity of the campaign

The business process group for settlement of setup orders and clean-out orders

Choose Continue

The Create Production Campaign: Overview screen appears. All planned orders and process orders that fall within the given time period are listed here for selection.

Complete the following data if necessary:

Validity period

Total quantity

Business process group (via Environment -> Busn.Proc.Group )

Takt time

Fixed lot size

       5.      Add or create any orders that may still be needed. You can do the following:

Create and Add Setup/Clean-Out Orders

Create Planned Orders

Add Existing Planned and Process Orders

Save the campaign.