1. Initial creation of the background job:
a) Initial screen Define Job :
Job name: J1CS100X
Job class: C
Status: Planned
b) Set and save the start time and repeat interval: Choose Start time
c) Display and edit the step list: Choose Steps
d) Select the step and assign variants: Choose Change
User: MILLER
ABAP program
Name: J1CS100X
Variant: SEL1
Language: E
e) Set and save the print parameters: Choose Print specifications
f) Save the step parameters
g) Save the background job in the Define Job screen
h) If you wish, view the job by choosing:
i) Return to background job planning
2. Enhance background job
a) Enter the name of the job to be enhanced:
Job name: J1CS100X
Job class: C
Status: Planned
b) Edit steps: Choose Steps
c) Add a new variant to the step: Choose Create
User name: MILLER
Choose ABAP
ABAP program
Name: J1CS100X
Variant: SEL2
d) Save the step
e) Save the job
Result: The same job (J1CS100X) holds two separate reports. The "enhanced" report uses the new variant in the second step .