Start Level 1 Node: Production Orders (PP-SFC)Production Orders (PP-SFC)End Level 1 Node: Production Orders (PP-SFC)
   Start Level 2 Node: Production Order MaintenanceProduction Order MaintenanceEnd Level 2 Node: Production Order Maintenance
      Start Level 3 Node: Creating a Production OrderCreating a Production OrderEnd Level 3 Node: Creating a Production Order
      Start Level 3 Node: Changing a Production OrderChanging a Production OrderEnd Level 3 Node: Changing a Production Order
      Start Level 3 Node: Production Order CreationProduction Order CreationEnd Level 3 Node: Production Order Creation
         Start Level 4 Node: Creating a Production Order with a MaterialCreating a Production Order with a MaterialEnd Level 4 Node: Creating a Production Order with a Material
         Start Level 4 Node: Creating Production Orders Without a MaterialCreating Production Orders Without a MaterialEnd Level 4 Node: Creating Production Orders Without a Material
         Start Level 4 Node: Creating a Production Order with a Sales OrderCreating a Production Order with a Sales OrderEnd Level 4 Node: Creating a Production Order with a Sales Order
      Start Level 3 Node: Maintenance of Header Data in the Production OrderMaintenance of Header Data in the Production OrderEnd Level 3 Node: Maintenance of Header Data in the Production Order
         Start Level 4 Node: Changing Header DataChanging Header DataEnd Level 4 Node: Changing Header Data
      Start Level 3 Node: Maintenance of Operation DataMaintenance of Operation DataEnd Level 3 Node: Maintenance of Operation Data
         Start Level 4 Node: Maintenance of the Operation OverviewMaintenance of the Operation OverviewEnd Level 4 Node: Maintenance of the Operation Overview
         Start Level 4 Node: Maintaining an Individual OperationMaintaining an Individual OperationEnd Level 4 Node: Maintaining an Individual Operation
         Start Level 4 Node: Cumulating Standard ValuesCumulating Standard ValuesEnd Level 4 Node: Cumulating Standard Values
      Start Level 3 Node: Planned Order ConversionPlanned Order ConversionEnd Level 3 Node: Planned Order Conversion
         Start Level 4 Node: Executing Individual Conversion of Planned OrdersExecuting Individual Conversion of Planned OrdersEnd Level 4 Node: Executing Individual Conversion of Planned Orders
         Start Level 4 Node: Executing Collective Conversion of Planned OrdersExecuting Collective Conversion of Planned OrdersEnd Level 4 Node: Executing Collective Conversion of Planned Orders
         Start Level 4 Node: Partial Conversion of Planned OrdersPartial Conversion of Planned OrdersEnd Level 4 Node: Partial Conversion of Planned Orders
            Start Level 5 Node: Executing Partial Conversion of Planned OrdersExecuting Partial Conversion of Planned OrdersEnd Level 5 Node: Executing Partial Conversion of Planned Orders
      Start Level 3 Node: Order ComparisonOrder ComparisonEnd Level 3 Node: Order Comparison
      Start Level 3 Node: Simulation OrderSimulation OrderEnd Level 3 Node: Simulation Order
   Start Level 2 Node: Copying Master DataCopying Master DataEnd Level 2 Node: Copying Master Data
      Start Level 3 Node: Routing SelectionRouting SelectionEnd Level 3 Node: Routing Selection
         Start Level 4 Node: Settings for Routing SelectionSettings for Routing SelectionEnd Level 4 Node: Settings for Routing Selection
         Start Level 4 Node: Automatically Selecting a RoutingAutomatically Selecting a RoutingEnd Level 4 Node: Automatically Selecting a Routing
            Start Level 5 Node: Priorities for Automatic Routing Selection: ExamplePriorities for Automatic Routing Selection: ExampleEnd Level 5 Node: Priorities for Automatic Routing Selection: Example
         Start Level 4 Node: Selecting a Routing Manually/Working without a RoutingSelecting a Routing Manually/Working without a RoutingEnd Level 4 Node: Selecting a Routing Manually/Working without a Routing
         Start Level 4 Node: SequencesSequencesEnd Level 4 Node: Sequences
            Start Level 5 Node: Exchanging Alternative SequencesExchanging Alternative SequencesEnd Level 5 Node: Exchanging Alternative Sequences
            Start Level 5 Node: Adding Parallel SequencesAdding Parallel SequencesEnd Level 5 Node: Adding Parallel Sequences
            Start Level 5 Node: Changing Parallel SequencesChanging Parallel SequencesEnd Level 5 Node: Changing Parallel Sequences
      Start Level 3 Node: Selecting Bills of MaterialSelecting Bills of MaterialEnd Level 3 Node: Selecting Bills of Material
         Start Level 4 Node: Settings for Bill of Material SelectionSettings for Bill of Material SelectionEnd Level 4 Node: Settings for Bill of Material Selection
         Start Level 4 Node: Selecting a Bill of Material AlternativeSelecting a Bill of Material AlternativeEnd Level 4 Node: Selecting a Bill of Material Alternative
         Start Level 4 Node: Priorities for BOM Usage (Selection Priorities)Priorities for BOM Usage (Selection Priorities)End Level 4 Node: Priorities for BOM Usage (Selection Priorities)
         Start Level 4 Node: BOM ExplosionBOM ExplosionEnd Level 4 Node: BOM Explosion
            Start Level 5 Node: Determination of the Explosion DateDetermination of the Explosion DateEnd Level 5 Node: Determination of the Explosion Date
      Start Level 3 Node: Reading Master DataReading Master DataEnd Level 3 Node: Reading Master Data
         Start Level 4 Node: Reading Master DataReading Master DataEnd Level 4 Node: Reading Master Data
         Start Level 4 Node: Criteria for a Single OrderCriteria for a Single OrderEnd Level 4 Node: Criteria for a Single Order
         Start Level 4 Node: Criteria in the Collective OrderCriteria in the Collective OrderEnd Level 4 Node: Criteria in the Collective Order
   Start Level 2 Node: Document Integration in the Production OrderDocument Integration in the Production OrderEnd Level 2 Node: Document Integration in the Production Order
      Start Level 3 Node: Settings for Document IntegrationSettings for Document IntegrationEnd Level 3 Node: Settings for Document Integration
      Start Level 3 Node: Automatic Generation of Document LinksAutomatic Generation of Document LinksEnd Level 3 Node: Automatic Generation of Document Links
      Start Level 3 Node: Manual Generation of Document LinksManual Generation of Document LinksEnd Level 3 Node: Manual Generation of Document Links
         Start Level 4 Node: Generating a Document Link from Master DataGenerating a Document Link from Master DataEnd Level 4 Node: Generating a Document Link from Master Data
         Start Level 4 Node: Creating a Document LinkCreating a Document LinkEnd Level 4 Node: Creating a Document Link
      Start Level 3 Node: Document Link MaintenanceDocument Link MaintenanceEnd Level 3 Node: Document Link Maintenance
         Start Level 4 Node: Changing Document LinksChanging Document LinksEnd Level 4 Node: Changing Document Links
         Start Level 4 Node: Reassigning Document LinksReassigning Document LinksEnd Level 4 Node: Reassigning Document Links
         Start Level 4 Node: Deleting Document LinksDeleting Document LinksEnd Level 4 Node: Deleting Document Links
         Start Level 4 Node: Displaying Document Info RecordsDisplaying Document Info RecordsEnd Level 4 Node: Displaying Document Info Records
         Start Level 4 Node: Displaying Original FilesDisplaying Original FilesEnd Level 4 Node: Displaying Original Files
      Start Level 3 Node: Integrated Viewer for Displaying Original Application FilesIntegrated Viewer for Displaying Original Application FilesEnd Level 3 Node: Integrated Viewer for Displaying Original Application Files
   Start Level 2 Node: SchedulingSchedulingEnd Level 2 Node: Scheduling
      Start Level 3 Node: Settings for SchedulingSettings for SchedulingEnd Level 3 Node: Settings for Scheduling
         Start Level 4 Node: Scheduling TypesScheduling TypesEnd Level 4 Node: Scheduling Types
         Start Level 4 Node: Scheduling ParametersScheduling ParametersEnd Level 4 Node: Scheduling Parameters
         Start Level 4 Node: Control Key for OperationsControl Key for OperationsEnd Level 4 Node: Control Key for Operations
      Start Level 3 Node: Scheduling Individual OrdersScheduling Individual OrdersEnd Level 3 Node: Scheduling Individual Orders
         Start Level 4 Node: Date Determination at Order LevelDate Determination at Order LevelEnd Level 4 Node: Date Determination at Order Level
            Start Level 5 Node: Date Determination when an Order is CreatedDate Determination when an Order is CreatedEnd Level 5 Node: Date Determination when an Order is Created
            Start Level 5 Node: Example: Calculation of Order DatesExample: Calculation of Order DatesEnd Level 5 Node: Example: Calculation of Order Dates
         Start Level 4 Node: Date Determination at Operation LevelDate Determination at Operation LevelEnd Level 4 Node: Date Determination at Operation Level
            Start Level 5 Node: Determination of the Operating TimeDetermination of the Operating TimeEnd Level 5 Node: Determination of the Operating Time
            Start Level 5 Node: Duration of the Operation SegmentsDuration of the Operation SegmentsEnd Level 5 Node: Duration of the Operation Segments
            Start Level 5 Node: Example: Determining the Operation DatesExample: Determining the Operation DatesEnd Level 5 Node: Example: Determining the Operation Dates
            Start Level 5 Node: Simultaneous Teardown and WaitSimultaneous Teardown and WaitEnd Level 5 Node: Simultaneous Teardown and Wait
            Start Level 5 Node: Queue Time (Earliest and Latest Dates)Queue Time (Earliest and Latest Dates)End Level 5 Node: Queue Time (Earliest and Latest Dates)
            Start Level 5 Node: SplittingSplittingEnd Level 5 Node: Splitting
            Start Level 5 Node: Overlapping and Process Flow ProductionOverlapping and Process Flow ProductionEnd Level 5 Node: Overlapping and Process Flow Production
            Start Level 5 Node: Parallel SequencesParallel SequencesEnd Level 5 Node: Parallel Sequences
            Start Level 5 Node: Suboperation DatesSuboperation DatesEnd Level 5 Node: Suboperation Dates
            Start Level 5 Node: Scheduling Partially Confirmed OperationsScheduling Partially Confirmed OperationsEnd Level 5 Node: Scheduling Partially Confirmed Operations
            Start Level 5 Node: Lead Time Scheduling with TaktsLead Time Scheduling with TaktsEnd Level 5 Node: Lead Time Scheduling with Takts
         Start Level 4 Node: Reduction MeasuresReduction MeasuresEnd Level 4 Node: Reduction Measures
         Start Level 4 Node: Starting SchedulingStarting SchedulingEnd Level 4 Node: Starting Scheduling
         Start Level 4 Node: Displaying Scheduling Settings and Scheduling ResultsDisplaying Scheduling Settings and Scheduling ResultsEnd Level 4 Node: Displaying Scheduling Settings and Scheduling Results
      Start Level 3 Node: Scheduling Collective OrdersScheduling Collective OrdersEnd Level 3 Node: Scheduling Collective Orders
         Start Level 4 Node: Linking Dates in Collective OrdersLinking Dates in Collective OrdersEnd Level 4 Node: Linking Dates in Collective Orders
         Start Level 4 Node: Overlapping in Collective OrdersOverlapping in Collective OrdersEnd Level 4 Node: Overlapping in Collective Orders
         Start Level 4 Node: Reduction via the Critical PathReduction via the Critical PathEnd Level 4 Node: Reduction via the Critical Path
      Start Level 3 Node: Scheduling of Requirements DatesScheduling of Requirements DatesEnd Level 3 Node: Scheduling of Requirements Dates
      Start Level 3 Node: Capacity RequirementsCapacity RequirementsEnd Level 3 Node: Capacity Requirements
         Start Level 4 Node: Assigning Capacity RequirementsAssigning Capacity RequirementsEnd Level 4 Node: Assigning Capacity Requirements
   Start Level 2 Node: Dispatching and Deallocating Without the Planning BoardDispatching and Deallocating Without the Planning BoardEnd Level 2 Node: Dispatching and Deallocating Without the Planning Board
   Start Level 2 Node: ComponentsComponentsEnd Level 2 Node: Components
      Start Level 3 Node: Data from Bills of MaterialData from Bills of MaterialEnd Level 3 Node: Data from Bills of Material
      Start Level 3 Node: Data from the RoutingData from the RoutingEnd Level 3 Node: Data from the Routing
      Start Level 3 Node: Data from the Material Master RecordData from the Material Master RecordEnd Level 3 Node: Data from the Material Master Record
      Start Level 3 Node: Manually Creating or Changing ComponentsManually Creating or Changing ComponentsEnd Level 3 Node: Manually Creating or Changing Components
      Start Level 3 Node: Changing Component DataChanging Component DataEnd Level 3 Node: Changing Component Data
      Start Level 3 Node: Assignment of ComponentsAssignment of ComponentsEnd Level 3 Node: Assignment of Components
         Start Level 4 Node: Creating ComponentsCreating ComponentsEnd Level 4 Node: Creating Components
         Start Level 4 Node: Reassigning ComponentsReassigning ComponentsEnd Level 4 Node: Reassigning Components
         Start Level 4 Node: Sorting in the Component OverviewSorting in the Component OverviewEnd Level 4 Node: Sorting in the Component Overview
         Start Level 4 Node: Filtering in the Component OverviewFiltering in the Component OverviewEnd Level 4 Node: Filtering in the Component Overview
         Start Level 4 Node: Deleting ComponentsDeleting ComponentsEnd Level 4 Node: Deleting Components
      Start Level 3 Node: Backflushing with Stock ShortageBackflushing with Stock ShortageEnd Level 3 Node: Backflushing with Stock Shortage
      Start Level 3 Node: Alternative ItemsAlternative ItemsEnd Level 3 Node: Alternative Items
      Start Level 3 Node: Discontinuation DataDiscontinuation DataEnd Level 3 Node: Discontinuation Data
      Start Level 3 Node: Batch DeterminationBatch DeterminationEnd Level 3 Node: Batch Determination
         Start Level 4 Node: Executing Batch DeterminationExecuting Batch DeterminationEnd Level 4 Node: Executing Batch Determination
         Start Level 4 Node: Batch SplitsBatch SplitsEnd Level 4 Node: Batch Splits
         Start Level 4 Node: Splitting BatchesSplitting BatchesEnd Level 4 Node: Splitting Batches
         Start Level 4 Node: Batch Splits: Requirement QuantitiesBatch Splits: Requirement QuantitiesEnd Level 4 Node: Batch Splits: Requirement Quantities
      Start Level 3 Node: Batch KeyBatch KeyEnd Level 3 Node: Batch Key
   Start Level 2 Node: Production Resources and Tools (PRTs)Production Resources and Tools (PRTs)End Level 2 Node: Production Resources and Tools (PRTs)
      Start Level 3 Node: Creating Production Resources/Tools as MaterialCreating Production Resources/Tools as MaterialEnd Level 3 Node: Creating Production Resources/Tools as Material
      Start Level 3 Node: Creating Production Resources/Tools as EquipmentCreating Production Resources/Tools as EquipmentEnd Level 3 Node: Creating Production Resources/Tools as Equipment
      Start Level 3 Node: Creating Production Resources/Tools as a DocumentCreating Production Resources/Tools as a DocumentEnd Level 3 Node: Creating Production Resources/Tools as a Document
      Start Level 3 Node: Creating Prod. Resources/Tools with a PRT Master Record (Misc.)Creating Prod. Resources/Tools with a PRT Master Record (Misc.)End Level 3 Node: Creating Prod. Resources/Tools with a PRT Master Record (Misc.)
      Start Level 3 Node: Classifying Production Resources/ToolsClassifying Production Resources/ToolsEnd Level 3 Node: Classifying Production Resources/Tools
      Start Level 3 Node: Linking a Document to a Production Resource/ToolLinking a Document to a Production Resource/ToolEnd Level 3 Node: Linking a Document to a Production Resource/Tool
      Start Level 3 Node: Releasing/Locking Production Resources/ToolsReleasing/Locking Production Resources/ToolsEnd Level 3 Node: Releasing/Locking Production Resources/Tools
      Start Level 3 Node: Maintenance Planning for Production Resources/ToolsMaintenance Planning for Production Resources/ToolsEnd Level 3 Node: Maintenance Planning for Production Resources/Tools
         Start Level 4 Node: Creating PRT Usage CountersCreating PRT Usage CountersEnd Level 4 Node: Creating PRT Usage Counters
         Start Level 4 Node: Creating Measurement Documents for PRT Usage CountersCreating Measurement Documents for PRT Usage CountersEnd Level 4 Node: Creating Measurement Documents for PRT Usage Counters
         Start Level 4 Node: Assigning PRT Usage Counters to Prod. Resources/ToolsAssigning PRT Usage Counters to Prod. Resources/ToolsEnd Level 4 Node: Assigning PRT Usage Counters to Prod. Resources/Tools
         Start Level 4 Node: Assigning Preventive Maintenance Plans to Prod. Resources/ToolsAssigning Preventive Maintenance Plans to Prod. Resources/ToolsEnd Level 4 Node: Assigning Preventive Maintenance Plans to Prod. Resources/Tools
      Start Level 3 Node: Deletion of Production Resources/ToolsDeletion of Production Resources/ToolsEnd Level 3 Node: Deletion of Production Resources/Tools
         Start Level 4 Node: Deleting Production Resources/Tools with a PRT Master RecordDeleting Production Resources/Tools with a PRT Master RecordEnd Level 4 Node: Deleting Production Resources/Tools with a PRT Master Record
         Start Level 4 Node: Production Resources/Tools: Setting/Canceling a Deletion FlagProduction Resources/Tools: Setting/Canceling a Deletion FlagEnd Level 4 Node: Production Resources/Tools: Setting/Canceling a Deletion Flag
      Start Level 3 Node: Assignment of Production Resources/Tools to OperationsAssignment of Production Resources/Tools to OperationsEnd Level 3 Node: Assignment of Production Resources/Tools to Operations
         Start Level 4 Node: Assigning Production Resources/Tools to OperationsAssigning Production Resources/Tools to OperationsEnd Level 4 Node: Assigning Production Resources/Tools to Operations
         Start Level 4 Node: Production Resources/Tools: Deleting Assignments to OperationsProduction Resources/Tools: Deleting Assignments to OperationsEnd Level 4 Node: Production Resources/Tools: Deleting Assignments to Operations
      Start Level 3 Node: Assignment of Test Equipment to Inspection CharacteristicsAssignment of Test Equipment to Inspection CharacteristicsEnd Level 3 Node: Assignment of Test Equipment to Inspection Characteristics
         Start Level 4 Node: Assigning Test Equipment to Inspection CharacteristicsAssigning Test Equipment to Inspection CharacteristicsEnd Level 4 Node: Assigning Test Equipment to Inspection Characteristics
   Start Level 2 Node: Trigger PointsTrigger PointsEnd Level 2 Node: Trigger Points
      Start Level 3 Node: Standard Trigger PointsStandard Trigger PointsEnd Level 3 Node: Standard Trigger Points
      Start Level 3 Node: Trigger Point GroupsTrigger Point GroupsEnd Level 3 Node: Trigger Point Groups
      Start Level 3 Node: Example: Triggering a Function when Status ChangesExample: Triggering a Function when Status ChangesEnd Level 3 Node: Example: Triggering a Function when Status Changes
      Start Level 3 Node: Example: Manually Triggering Functions During ConfirmationExample: Manually Triggering Functions During ConfirmationEnd Level 3 Node: Example: Manually Triggering Functions During Confirmation
      Start Level 3 Node: Example: Linking a User Status to a Reason for VarianceExample: Linking a User Status to a Reason for VarianceEnd Level 3 Node: Example: Linking a User Status to a Reason for Variance
      Start Level 3 Node: Creating Trigger PointsCreating Trigger PointsEnd Level 3 Node: Creating Trigger Points
      Start Level 3 Node: Trigger Points: UsageTrigger Points: UsageEnd Level 3 Node: Trigger Points: Usage
      Start Level 3 Node: Example: Using the Release Stop IndicatorExample: Using the Release Stop IndicatorEnd Level 3 Node: Example: Using the Release Stop Indicator
   Start Level 2 Node: Availability CheckAvailability CheckEnd Level 2 Node: Availability Check
      Start Level 3 Node: Checking the Availability of MaterialChecking the Availability of MaterialEnd Level 3 Node: Checking the Availability of Material
         Start Level 4 Node: Checking GroupChecking GroupEnd Level 4 Node: Checking Group
         Start Level 4 Node: Checking RuleChecking RuleEnd Level 4 Node: Checking Rule
         Start Level 4 Node: Checking ScopeChecking ScopeEnd Level 4 Node: Checking Scope
         Start Level 4 Node: Checking ControlChecking ControlEnd Level 4 Node: Checking Control
      Start Level 3 Node: How is the Availability Determined?How is the Availability Determined?End Level 3 Node: How is the Availability Determined?
      Start Level 3 Node: At What Level is the Availability Checked?At What Level is the Availability Checked?End Level 3 Node: At What Level is the Availability Checked?
      Start Level 3 Node: When is the Availability Checked?When is the Availability Checked?End Level 3 Node: When is the Availability Checked?
      Start Level 3 Node: Carrying out an Availability CheckCarrying out an Availability CheckEnd Level 3 Node: Carrying out an Availability Check
      Start Level 3 Node: Resetting Checking ResultResetting Checking ResultEnd Level 3 Node: Resetting Checking Result
      Start Level 3 Node: Collective Availability CheckCollective Availability CheckEnd Level 3 Node: Collective Availability Check
         Start Level 4 Node: Collective Availability Check: CriteriaCollective Availability Check: CriteriaEnd Level 4 Node: Collective Availability Check: Criteria
         Start Level 4 Node: Collective Availability Check: ResultsCollective Availability Check: ResultsEnd Level 4 Node: Collective Availability Check: Results
         Start Level 4 Node: Executing a Collective Availability CheckExecuting a Collective Availability CheckEnd Level 4 Node: Executing a Collective Availability Check
      Start Level 3 Node: Checking Availability of PRTsChecking Availability of PRTsEnd Level 3 Node: Checking Availability of PRTs
         Start Level 4 Node: Execute Availability Check for PRTsExecute Availability Check for PRTsEnd Level 4 Node: Execute Availability Check for PRTs
      Start Level 3 Node: Checking the Availability of CapacitiesChecking the Availability of CapacitiesEnd Level 3 Node: Checking the Availability of Capacities
   Start Level 2 Node: Preliminary CostingPreliminary CostingEnd Level 2 Node: Preliminary Costing
      Start Level 3 Node: Cost ElementsCost ElementsEnd Level 3 Node: Cost Elements
      Start Level 3 Node: Material CostsMaterial CostsEnd Level 3 Node: Material Costs
         Start Level 4 Node: Planned Costs for ComponentsPlanned Costs for ComponentsEnd Level 4 Node: Planned Costs for Components
         Start Level 4 Node: Planned Costs for Material Manufactured In-housePlanned Costs for Material Manufactured In-houseEnd Level 4 Node: Planned Costs for Material Manufactured In-house
         Start Level 4 Node: Planned Costs for Material Procured ExternallyPlanned Costs for Material Procured ExternallyEnd Level 4 Node: Planned Costs for Material Procured Externally
      Start Level 3 Node: Production CostsProduction CostsEnd Level 3 Node: Production Costs
         Start Level 4 Node: Planned Costs for ProductionPlanned Costs for ProductionEnd Level 4 Node: Planned Costs for Production
         Start Level 4 Node: Planned Costs for Internal ActivityPlanned Costs for Internal ActivityEnd Level 4 Node: Planned Costs for Internal Activity
      Start Level 3 Node: Setting up a Quantity StructureSetting up a Quantity StructureEnd Level 3 Node: Setting up a Quantity Structure
      Start Level 3 Node: Planned Costs for External ProcessingPlanned Costs for External ProcessingEnd Level 3 Node: Planned Costs for External Processing
      Start Level 3 Node: Overhead CostsOverhead CostsEnd Level 3 Node: Overhead Costs
      Start Level 3 Node: Overhead GroupsOverhead GroupsEnd Level 3 Node: Overhead Groups
      Start Level 3 Node: Displaying CostsDisplaying CostsEnd Level 3 Node: Displaying Costs
   Start Level 2 Node: Order ReleaseOrder ReleaseEnd Level 2 Node: Order Release
      Start Level 3 Node: Release at Order Header LevelRelease at Order Header LevelEnd Level 3 Node: Release at Order Header Level
         Start Level 4 Node: Manual Release of OrdersManual Release of OrdersEnd Level 4 Node: Manual Release of Orders
         Start Level 4 Node: Automatic ReleaseAutomatic ReleaseEnd Level 4 Node: Automatic Release
         Start Level 4 Node: Collective ReleaseCollective ReleaseEnd Level 4 Node: Collective Release
            Start Level 5 Node: Executing Collective ReleaseExecuting Collective ReleaseEnd Level 5 Node: Executing Collective Release
      Start Level 3 Node: Release of OperationsRelease of OperationsEnd Level 3 Node: Release of Operations
         Start Level 4 Node: Releasing an OperationReleasing an OperationEnd Level 4 Node: Releasing an Operation
   Start Level 2 Node: Material Serial Numbers in Production OrdersMaterial Serial Numbers in Production OrdersEnd Level 2 Node: Material Serial Numbers in Production Orders
   Start Level 2 Node: As-Built ConfigurationAs-Built ConfigurationEnd Level 2 Node: As-Built Configuration
      Start Level 3 Node: Creation of As-Built ConfigurationsCreation of As-Built ConfigurationsEnd Level 3 Node: Creation of As-Built Configurations
         Start Level 4 Node: Creating/Changing an As-Built Configuration Using the List InputCreating/Changing an As-Built Configuration Using the List InputEnd Level 4 Node: Creating/Changing an As-Built Configuration Using the List Input
         Start Level 4 Node: Creating/Changing As-Built Configurations Using Node AssignmentCreating/Changing As-Built Configurations Using Node AssignmentEnd Level 4 Node: Creating/Changing As-Built Configurations Using Node Assignment
   Start Level 2 Node: Inspection LotsInspection LotsEnd Level 2 Node: Inspection Lots
      Start Level 3 Node: Creating Inspection LotsCreating Inspection LotsEnd Level 3 Node: Creating Inspection Lots
      Start Level 3 Node: Deleting Inspection LotsDeleting Inspection LotsEnd Level 3 Node: Deleting Inspection Lots
      Start Level 3 Node: Creating Inspection CharacteristicsCreating Inspection CharacteristicsEnd Level 3 Node: Creating Inspection Characteristics
      Start Level 3 Node: Deleting Operations with Inspection CharacteristicsDeleting Operations with Inspection CharacteristicsEnd Level 3 Node: Deleting Operations with Inspection Characteristics
      Start Level 3 Node: Inspection Lots: RestrictionsInspection Lots: RestrictionsEnd Level 3 Node: Inspection Lots: Restrictions
   Start Level 2 Node: Missing PartsMissing PartsEnd Level 2 Node: Missing Parts
      Start Level 3 Node: Calling Up a Missing Parts ListCalling Up a Missing Parts ListEnd Level 3 Node: Calling Up a Missing Parts List
      Start Level 3 Node: Backorder ProcessingBackorder ProcessingEnd Level 3 Node: Backorder Processing
         Start Level 4 Node: Mail LinkMail LinkEnd Level 4 Node: Mail Link
         Start Level 4 Node: Checking RuleChecking RuleEnd Level 4 Node: Checking Rule
         Start Level 4 Node: Calling Up Backorder ProcessingCalling Up Backorder ProcessingEnd Level 4 Node: Calling Up Backorder Processing
         Start Level 4 Node: Processing Dependent ReservationsProcessing Dependent ReservationsEnd Level 4 Node: Processing Dependent Reservations
         Start Level 4 Node: Processing Sales OrdersProcessing Sales OrdersEnd Level 4 Node: Processing Sales Orders
   Start Level 2 Node: Printing Shop Papers (PP-SFC-EXE-PRINT, PP-SFC-ADB-PRN)Printing Shop Papers (PP-SFC-EXE-PRINT, PP-SFC-ADB-PRN)End Level 2 Node: Printing Shop Papers (PP-SFC-EXE-PRINT, PP-SFC-ADB-PRN)
      Start Level 3 Node: Prerequisites: Printing Shop PapersPrerequisites: Printing Shop PapersEnd Level 3 Node: Prerequisites: Printing Shop Papers
      Start Level 3 Node: Print from Production OrderPrint from Production OrderEnd Level 3 Node: Print from Production Order
      Start Level 3 Node: Issue Print JobsIssue Print JobsEnd Level 3 Node: Issue Print Jobs
      Start Level 3 Node: Print Component/Operation Overview (from Production Order)Print Component/Operation Overview (from Production Order)End Level 3 Node: Print Component/Operation Overview (from Production Order)
      Start Level 3 Node: Print Automatically on Order ReleasePrint Automatically on Order ReleaseEnd Level 3 Node: Print Automatically on Order Release
      Start Level 3 Node: Print Production Orders (in Mass Processing)Print Production Orders (in Mass Processing)End Level 3 Node: Print Production Orders (in Mass Processing)
   Start Level 2 Node: External Procurement/ProcessingExternal Procurement/ProcessingEnd Level 2 Node: External Procurement/Processing
      Start Level 3 Node: External Processing of OperationsExternal Processing of OperationsEnd Level 3 Node: External Processing of Operations
      Start Level 3 Node: External Procurement of ComponentsExternal Procurement of ComponentsEnd Level 3 Node: External Procurement of Components
      Start Level 3 Node: Goods ReceiptGoods ReceiptEnd Level 3 Node: Goods Receipt
      Start Level 3 Node: Changes in the OrderChanges in the OrderEnd Level 3 Node: Changes in the Order
      Start Level 3 Node: Provision of ComponentsProvision of ComponentsEnd Level 3 Node: Provision of Components
      Start Level 3 Node: Scheduling an External OperationScheduling an External OperationEnd Level 3 Node: Scheduling an External Operation
      Start Level 3 Node: Costs of External Processing/ProcurementCosts of External Processing/ProcurementEnd Level 3 Node: Costs of External Processing/Procurement
   Start Level 2 Node: Process IntegrationProcess IntegrationEnd Level 2 Node: Process Integration
   Start Level 2 Node: Goods MovementsGoods MovementsEnd Level 2 Node: Goods Movements
      Start Level 3 Node: Withdrawing Material ComponentsWithdrawing Material ComponentsEnd Level 3 Node: Withdrawing Material Components
      Start Level 3 Node: Goods Movement OverviewGoods Movement OverviewEnd Level 3 Node: Goods Movement Overview
         Start Level 4 Node: Splitting Goods MovementsSplitting Goods MovementsEnd Level 4 Node: Splitting Goods Movements
         Start Level 4 Node: Executing Batch DeterminationExecuting Batch DeterminationEnd Level 4 Node: Executing Batch Determination
         Start Level 4 Node: Executing Stock DeterminationExecuting Stock DeterminationEnd Level 4 Node: Executing Stock Determination
      Start Level 3 Node: PickingPickingEnd Level 3 Node: Picking
         Start Level 4 Node: Picking - ExecutionPicking - ExecutionEnd Level 4 Node: Picking - Execution
      Start Level 3 Node: Stock DeterminationStock DeterminationEnd Level 3 Node: Stock Determination
      Start Level 3 Node: Material Staging (with WM)Material Staging (with WM)End Level 3 Node: Material Staging (with WM)
      Start Level 3 Node: Material Staging (with EWM)Material Staging (with EWM)End Level 3 Node: Material Staging (with EWM)
      Start Level 3 Node: Executing Unplanned Withdrawal of Components for an OrderExecuting Unplanned Withdrawal of Components for an OrderEnd Level 3 Node: Executing Unplanned Withdrawal of Components for an Order
      Start Level 3 Node: Automatic Creation of BatchesAutomatic Creation of BatchesEnd Level 3 Node: Automatic Creation of Batches
      Start Level 3 Node: Delivering to the WarehouseDelivering to the WarehouseEnd Level 3 Node: Delivering to the Warehouse
      Start Level 3 Node: Automatic Goods ReceiptAutomatic Goods ReceiptEnd Level 3 Node: Automatic Goods Receipt
      Start Level 3 Node: What Checks are Carried out During a Goods Receipt?What Checks are Carried out During a Goods Receipt?End Level 3 Node: What Checks are Carried out During a Goods Receipt?
      Start Level 3 Node: Effects of a Delivery to StockEffects of a Delivery to StockEnd Level 3 Node: Effects of a Delivery to Stock
         Start Level 4 Node: Delivery to Stock: CostsDelivery to Stock: CostsEnd Level 4 Node: Delivery to Stock: Costs
         Start Level 4 Node: Delivery to Stock: Updates in the Material MasterDelivery to Stock: Updates in the Material MasterEnd Level 4 Node: Delivery to Stock: Updates in the Material Master
         Start Level 4 Node: Delivery to Stock: Updates in the OrderDelivery to Stock: Updates in the OrderEnd Level 4 Node: Delivery to Stock: Updates in the Order
      Start Level 3 Node: Performing a Goods ReceiptPerforming a Goods ReceiptEnd Level 3 Node: Performing a Goods Receipt
   Start Level 2 Node: ConfirmationsConfirmationsEnd Level 2 Node: Confirmations
      Start Level 3 Node: Confirmation: Fixed ParametersConfirmation: Fixed ParametersEnd Level 3 Node: Confirmation: Fixed Parameters
      Start Level 3 Node: Confirmation: Variable ParametersConfirmation: Variable ParametersEnd Level 3 Node: Confirmation: Variable Parameters
      Start Level 3 Node: Entering ConfirmationsEntering ConfirmationsEnd Level 3 Node: Entering Confirmations
         Start Level 4 Node: Entering Time Ticket ConfirmationsEntering Time Ticket ConfirmationsEnd Level 4 Node: Entering Time Ticket Confirmations
         Start Level 4 Node: Executing Single Screen Entry of Time Ticket ConfirmationsExecuting Single Screen Entry of Time Ticket ConfirmationsEnd Level 4 Node: Executing Single Screen Entry of Time Ticket Confirmations
            Start Level 5 Node: Settings for Single Screen EntrySettings for Single Screen EntryEnd Level 5 Node: Settings for Single Screen Entry
         Start Level 4 Node: Entering Collective ConfirmationsEntering Collective ConfirmationsEnd Level 4 Node: Entering Collective Confirmations
         Start Level 4 Node: Executing Fast Entry for Time TicketsExecuting Fast Entry for Time TicketsEnd Level 4 Node: Executing Fast Entry for Time Tickets
         Start Level 4 Node: Entering a Confirmation for a Time EventEntering a Confirmation for a Time EventEnd Level 4 Node: Entering a Confirmation for a Time Event
            Start Level 5 Node: Time Event ConfirmationsTime Event ConfirmationsEnd Level 5 Node: Time Event Confirmations
         Start Level 4 Node: Entering Confirmations at Order LevelEntering Confirmations at Order LevelEnd Level 4 Node: Entering Confirmations at Order Level
         Start Level 4 Node: Confirming Individual CapacitiesConfirming Individual CapacitiesEnd Level 4 Node: Confirming Individual Capacities
         Start Level 4 Node: Determining a Default for YieldDetermining a Default for YieldEnd Level 4 Node: Determining a Default for Yield
         Start Level 4 Node: Shift-Related ConfirmationShift-Related ConfirmationEnd Level 4 Node: Shift-Related Confirmation
         Start Level 4 Node: Enhancement of Quantity FieldsEnhancement of Quantity FieldsEnd Level 4 Node: Enhancement of Quantity Fields
         Start Level 4 Node: Insertion of Customer-Specific FieldsInsertion of Customer-Specific FieldsEnd Level 4 Node: Insertion of Customer-Specific Fields
         Start Level 4 Node: Automatic Generation of Quality NotificationsAutomatic Generation of Quality NotificationsEnd Level 4 Node: Automatic Generation of Quality Notifications
      Start Level 3 Node: Special Types of ConfirmationSpecial Types of ConfirmationEnd Level 3 Node: Special Types of Confirmation
         Start Level 4 Node: Milestone ConfirmationMilestone ConfirmationEnd Level 4 Node: Milestone Confirmation
         Start Level 4 Node: Progress ConfirmationProgress ConfirmationEnd Level 4 Node: Progress Confirmation
            Start Level 5 Node: Entering Progress ConfirmationsEntering Progress ConfirmationsEnd Level 5 Node: Entering Progress Confirmations
            Start Level 5 Node: Progress Confirmations and Operations with Final ConfirmationsProgress Confirmations and Operations with Final ConfirmationsEnd Level 5 Node: Progress Confirmations and Operations with Final Confirmations
         Start Level 4 Node: Summary ConfirmationsSummary ConfirmationsEnd Level 4 Node: Summary Confirmations
            Start Level 5 Node: Creating Summary ConfirmationsCreating Summary ConfirmationsEnd Level 5 Node: Creating Summary Confirmations
         Start Level 4 Node: Standard ConfirmationStandard ConfirmationEnd Level 4 Node: Standard Confirmation
            Start Level 5 Node: Entering Standard ConfirmationsEntering Standard ConfirmationsEnd Level 5 Node: Entering Standard Confirmations
      Start Level 3 Node: Goods Movements for ConfirmationGoods Movements for ConfirmationEnd Level 3 Node: Goods Movements for Confirmation
      Start Level 3 Node: Determining Quantities for Batch Splits/Parts to be DiscontinuedDetermining Quantities for Batch Splits/Parts to be DiscontinuedEnd Level 3 Node: Determining Quantities for Batch Splits/Parts to be Discontinued
      Start Level 3 Node: Displaying Requested ConfirmationsDisplaying Requested ConfirmationsEnd Level 3 Node: Displaying Requested Confirmations
      Start Level 3 Node: Displaying ConfirmationsDisplaying ConfirmationsEnd Level 3 Node: Displaying Confirmations
      Start Level 3 Node: Canceling ConfirmationsCanceling ConfirmationsEnd Level 3 Node: Canceling Confirmations
         Start Level 4 Node: Canceling ConfirmationsCanceling ConfirmationsEnd Level 4 Node: Canceling Confirmations
         Start Level 4 Node: Example: Canceling ConfirmationsExample: Canceling ConfirmationsEnd Level 4 Node: Example: Canceling Confirmations
      Start Level 3 Node: ReprocessingReprocessingEnd Level 3 Node: Reprocessing
         Start Level 4 Node: Reprocessing ConfirmationsReprocessing ConfirmationsEnd Level 4 Node: Reprocessing Confirmations
            Start Level 5 Node: Reprocessing ConfirmationsReprocessing ConfirmationsEnd Level 5 Node: Reprocessing Confirmations
         Start Level 4 Node: Cost Determination Error ProcessingCost Determination Error ProcessingEnd Level 4 Node: Cost Determination Error Processing
            Start Level 5 Node: Starting a New Costing RunStarting a New Costing RunEnd Level 5 Node: Starting a New Costing Run
         Start Level 4 Node: Failed Goods Movements ProcessingFailed Goods Movements ProcessingEnd Level 4 Node: Failed Goods Movements Processing
            Start Level 5 Node: Reprocessing Goods MovementsReprocessing Goods MovementsEnd Level 5 Node: Reprocessing Goods Movements
      Start Level 3 Node: Decoupling Processes Carried out During ConfirmationDecoupling Processes Carried out During ConfirmationEnd Level 3 Node: Decoupling Processes Carried out During Confirmation
         Start Level 4 Node: Settings for Decoupling Confirmation ProcessesSettings for Decoupling Confirmation ProcessesEnd Level 4 Node: Settings for Decoupling Confirmation Processes
         Start Level 4 Node: Example: Background ProcessingExample: Background ProcessingEnd Level 4 Node: Example: Background Processing
         Start Level 4 Node: Processing Predefined Confirmation ProcessesProcessing Predefined Confirmation ProcessesEnd Level 4 Node: Processing Predefined Confirmation Processes
      Start Level 3 Node: PDC InterfacePDC InterfaceEnd Level 3 Node: PDC Interface
         Start Level 4 Node: PP-PDC InterfacePP-PDC InterfaceEnd Level 4 Node: PP-PDC Interface
         Start Level 4 Node: Predecessor of the PP-PDC InterfacePredecessor of the PP-PDC InterfaceEnd Level 4 Node: Predecessor of the PP-PDC Interface
            Start Level 5 Node: PDC Data Transfer via Communication Channel 2 (CC2)PDC Data Transfer via Communication Channel 2 (CC2)End Level 5 Node: PDC Data Transfer via Communication Channel 2 (CC2)
               Start Level 6 Node: DownloadDownloadEnd Level 6 Node: Download
               Start Level 6 Node: UploadUploadEnd Level 6 Node: Upload
               Start Level 6 Node: Application Logic of the PDC Data Transfer in CC2Application Logic of the PDC Data Transfer in CC2End Level 6 Node: Application Logic of the PDC Data Transfer in CC2
            Start Level 5 Node: PP-PDC InterfacePP-PDC InterfaceEnd Level 5 Node: PP-PDC Interface
   Start Level 2 Node: ReworkReworkEnd Level 2 Node: Rework
      Start Level 3 Node: Rework Operations and Rework QuantitiesRework Operations and Rework QuantitiesEnd Level 3 Node: Rework Operations and Rework Quantities
      Start Level 3 Node: Rework and ConfirmationRework and ConfirmationEnd Level 3 Node: Rework and Confirmation
   Start Level 2 Node: Order SettlementOrder SettlementEnd Level 2 Node: Order Settlement
      Start Level 3 Node: Requirements for SettlementRequirements for SettlementEnd Level 3 Node: Requirements for Settlement
         Start Level 4 Node: Settlement ProfileSettlement ProfileEnd Level 4 Node: Settlement Profile
         Start Level 4 Node: Settlement StructureSettlement StructureEnd Level 4 Node: Settlement Structure
         Start Level 4 Node: Settlement RuleSettlement RuleEnd Level 4 Node: Settlement Rule
         Start Level 4 Node: Settlement: Standard SettingsSettlement: Standard SettingsEnd Level 4 Node: Settlement: Standard Settings
      Start Level 3 Node: Calling Up a Settlement RuleCalling Up a Settlement RuleEnd Level 3 Node: Calling Up a Settlement Rule
      Start Level 3 Node: Changing a Settlement RuleChanging a Settlement RuleEnd Level 3 Node: Changing a Settlement Rule
      Start Level 3 Node: Deleting a Distribution RuleDeleting a Distribution RuleEnd Level 3 Node: Deleting a Distribution Rule
      Start Level 3 Node: Creating Distribution RulesCreating Distribution RulesEnd Level 3 Node: Creating Distribution Rules
      Start Level 3 Node: Percent ValidationPercent ValidationEnd Level 3 Node: Percent Validation
      Start Level 3 Node: Delivery to StockDelivery to StockEnd Level 3 Node: Delivery to Stock
      Start Level 3 Node: Settling an OrderSettling an OrderEnd Level 3 Node: Settling an Order
      Start Level 3 Node: Result of SettlementResult of SettlementEnd Level 3 Node: Result of Settlement
      Start Level 3 Node: Connections Between Delivery and SettlementConnections Between Delivery and SettlementEnd Level 3 Node: Connections Between Delivery and Settlement
      Start Level 3 Node: Settlement in the Case of Stock ShortageSettlement in the Case of Stock ShortageEnd Level 3 Node: Settlement in the Case of Stock Shortage
         Start Level 4 Node: Example: Settlement in the Case of Stock ShortageExample: Settlement in the Case of Stock ShortageEnd Level 4 Node: Example: Settlement in the Case of Stock Shortage
      Start Level 3 Node: Settling ScrapSettling ScrapEnd Level 3 Node: Settling Scrap
         Start Level 4 Node: Example: Settling ScrapExample: Settling ScrapEnd Level 4 Node: Example: Settling Scrap
   Start Level 2 Node: Technical Completion of a Production OrderTechnical Completion of a Production OrderEnd Level 2 Node: Technical Completion of a Production Order
   Start Level 2 Node: Closing a Production OrderClosing a Production OrderEnd Level 2 Node: Closing a Production Order
   Start Level 2 Node: Archiving Production OrdersArchiving Production OrdersEnd Level 2 Node: Archiving Production Orders
   Start Level 2 Node: Order Change Management (OCM)Order Change Management (OCM)End Level 2 Node: Order Change Management (OCM)
      Start Level 3 Node: Change ProcessChange ProcessEnd Level 3 Node: Change Process
      Start Level 3 Node: Creation of Initiating Object RecordsCreation of Initiating Object RecordsEnd Level 3 Node: Creation of Initiating Object Records
         Start Level 4 Node: Change ProfileChange ProfileEnd Level 4 Node: Change Profile
      Start Level 3 Node: Processing Initiating Object RecordsProcessing Initiating Object RecordsEnd Level 3 Node: Processing Initiating Object Records
         Start Level 4 Node: Searching for Procurement ElementsSearching for Procurement ElementsEnd Level 4 Node: Searching for Procurement Elements
      Start Level 3 Node: Changing Production OrdersChanging Production OrdersEnd Level 3 Node: Changing Production Orders
         Start Level 4 Node: Executing Process StepsExecuting Process StepsEnd Level 4 Node: Executing Process Steps
         Start Level 4 Node: Creation of a Simulation OrderCreation of a Simulation OrderEnd Level 4 Node: Creation of a Simulation Order
         Start Level 4 Node: Determination of the ChangesDetermination of the ChangesEnd Level 4 Node: Determination of the Changes
            Start Level 5 Node: Executing a ComparisonExecuting a ComparisonEnd Level 5 Node: Executing a Comparison
         Start Level 4 Node: Checking ChangesChecking ChangesEnd Level 4 Node: Checking Changes
            Start Level 5 Node: Processing Change StepsProcessing Change StepsEnd Level 5 Node: Processing Change Steps
         Start Level 4 Node: Execution of the ChangesExecution of the ChangesEnd Level 4 Node: Execution of the Changes
         Start Level 4 Node: Execution with Marked ObjectsExecution with Marked ObjectsEnd Level 4 Node: Execution with Marked Objects
            Start Level 5 Node: Confirming or Rejecting Change ActionsConfirming or Rejecting Change ActionsEnd Level 5 Node: Confirming or Rejecting Change Actions
         Start Level 4 Node: Overview of the Change StepsOverview of the Change StepsEnd Level 4 Node: Overview of the Change Steps
         Start Level 4 Node: Change Management in the Production OrderChange Management in the Production OrderEnd Level 4 Node: Change Management in the Production Order
      Start Level 3 Node: Assembly Orders in Order Change ManagementAssembly Orders in Order Change ManagementEnd Level 3 Node: Assembly Orders in Order Change Management
         Start Level 4 Node: Completing a Change ComparisonCompleting a Change ComparisonEnd Level 4 Node: Completing a Change Comparison
   Start Level 2 Node: Mass Processing of Process and Production OrdersMass Processing of Process and Production OrdersEnd Level 2 Node: Mass Processing of Process and Production Orders
      Start Level 3 Node: Mass-Processing Functions for Production and Process OrdersMass-Processing Functions for Production and Process OrdersEnd Level 3 Node: Mass-Processing Functions for Production and Process Orders
         Start Level 4 Node: Confirmation of Process and Production OrdersConfirmation of Process and Production OrdersEnd Level 4 Node: Confirmation of Process and Production Orders
         Start Level 4 Node: Mass-Processing Functions for Planned OrdersMass-Processing Functions for Planned OrdersEnd Level 4 Node: Mass-Processing Functions for Planned Orders
      Start Level 3 Node: Displaying the Application Toolbar with Mass Proc. FunctionsDisplaying the Application Toolbar with Mass Proc. FunctionsEnd Level 3 Node: Displaying the Application Toolbar with Mass Proc. Functions
      Start Level 3 Node: LogsLogsEnd Level 3 Node: Logs
      Start Level 3 Node: Executing Mass Processing OnlineExecuting Mass Processing OnlineEnd Level 3 Node: Executing Mass Processing Online
      Start Level 3 Node: Scheduling Mass Processing in the BackgroundScheduling Mass Processing in the BackgroundEnd Level 3 Node: Scheduling Mass Processing in the Background
      Start Level 3 Node: Definition of VariantsDefinition of VariantsEnd Level 3 Node: Definition of Variants
      Start Level 3 Node: Processing or Deleting RequestsProcessing or Deleting RequestsEnd Level 3 Node: Processing or Deleting Requests
      Start Level 3 Node: Example: Using Mass ProcessingExample: Using Mass ProcessingEnd Level 3 Node: Example: Using Mass Processing
      Start Level 3 Node: Setting Up Parallel ProcessingSetting Up Parallel ProcessingEnd Level 3 Node: Setting Up Parallel Processing
   Start Level 2 Node: StatusStatusEnd Level 2 Node: Status
      Start Level 3 Node: System/User StatusSystem/User StatusEnd Level 3 Node: System/User Status
         Start Level 4 Node: Displaying a StatusDisplaying a StatusEnd Level 4 Node: Displaying a Status
      Start Level 3 Node: What is a Business Transaction?What is a Business Transaction?End Level 3 Node: What is a Business Transaction?
      Start Level 3 Node: What is a Status Profile?What is a Status Profile?End Level 3 Node: What is a Status Profile?
      Start Level 3 Node: What is a Selection Profile?What is a Selection Profile?End Level 3 Node: What is a Selection Profile?
      Start Level 3 Node: Creating User StatusesCreating User StatusesEnd Level 3 Node: Creating User Statuses
      Start Level 3 Node: Activating User StatusesActivating User StatusesEnd Level 3 Node: Activating User Statuses
      Start Level 3 Node: Status Change DocumentsStatus Change DocumentsEnd Level 3 Node: Status Change Documents
         Start Level 4 Node: Maintaining Default SettingsMaintaining Default SettingsEnd Level 4 Node: Maintaining Default Settings
         Start Level 4 Node: Displaying Status Change DocumentsDisplaying Status Change DocumentsEnd Level 4 Node: Displaying Status Change Documents
   Start Level 2 Node: Co- and By-ProductsCo- and By-ProductsEnd Level 2 Node: Co- and By-Products
      Start Level 3 Node: Co- and By-Products: PrerequisitesCo- and By-Products: PrerequisitesEnd Level 3 Node: Co- and By-Products: Prerequisites
      Start Level 3 Node: Co-Products: CostsCo-Products: CostsEnd Level 3 Node: Co-Products: Costs
      Start Level 3 Node: Co-Products: Source StructuresCo-Products: Source StructuresEnd Level 3 Node: Co-Products: Source Structures
   Start Level 2 Node: Collective OrdersCollective OrdersEnd Level 2 Node: Collective Orders
      Start Level 3 Node: Creation of Collective OrdersCreation of Collective OrdersEnd Level 3 Node: Creation of Collective Orders
      Start Level 3 Node: Maintaining Collective OrdersMaintaining Collective OrdersEnd Level 3 Node: Maintaining Collective Orders
      Start Level 3 Node: Costs in Collective OrdersCosts in Collective OrdersEnd Level 3 Node: Costs in Collective Orders
      Start Level 3 Node: Release of Collective OrdersRelease of Collective OrdersEnd Level 3 Node: Release of Collective Orders
         Start Level 4 Node: Example: Releasing Orders and Operations in Collective OrdersExample: Releasing Orders and Operations in Collective OrdersEnd Level 4 Node: Example: Releasing Orders and Operations in Collective Orders
      Start Level 3 Node: Confirmations in Collective OrdersConfirmations in Collective OrdersEnd Level 3 Node: Confirmations in Collective Orders
         Start Level 4 Node: Example: Confirming Collective OrdersExample: Confirming Collective OrdersEnd Level 4 Node: Example: Confirming Collective Orders
      Start Level 3 Node: Posting Sub-Assemblies to Stock in a Collective OrderPosting Sub-Assemblies to Stock in a Collective OrderEnd Level 3 Node: Posting Sub-Assemblies to Stock in a Collective Order
   Start Level 2 Node: Order Information SystemOrder Information SystemEnd Level 2 Node: Order Information System
      Start Level 3 Node: Definition of VariantsDefinition of VariantsEnd Level 3 Node: Definition of Variants
      Start Level 3 Node: Individual Object ListIndividual Object ListEnd Level 3 Node: Individual Object List
         Start Level 4 Node: ProfilesProfilesEnd Level 4 Node: Profiles
         Start Level 4 Node: LayoutsLayoutsEnd Level 4 Node: Layouts
      Start Level 3 Node: Object OverviewObject OverviewEnd Level 3 Node: Object Overview
         Start Level 4 Node: Overall ProfilesOverall ProfilesEnd Level 4 Node: Overall Profiles
         Start Level 4 Node: Selecting and Deselecting Database ObjectsSelecting and Deselecting Database ObjectsEnd Level 4 Node: Selecting and Deselecting Database Objects
      Start Level 3 Node: Navigation ProfilesNavigation ProfilesEnd Level 3 Node: Navigation Profiles
         Start Level 4 Node: Manage Navigation Profiles (Delete, Transport, Import)Manage Navigation Profiles (Delete, Transport, Import)End Level 4 Node: Manage Navigation Profiles (Delete, Transport, Import)
         Start Level 4 Node: Use Navigation Profiles in Your Own ALV Grid Controls and ALV TrUse Navigation Profiles in Your Own ALV Grid Controls and ALV TrEnd Level 4 Node: Use Navigation Profiles in Your Own ALV Grid Controls and ALV Tr
   Start Level 2 Node: Order Progress ReportOrder Progress ReportEnd Level 2 Node: Order Progress Report
      Start Level 3 Node: Settings for Order Progress ReportsSettings for Order Progress ReportsEnd Level 3 Node: Settings for Order Progress Reports
      Start Level 3 Node: Progress Value Determination and Display of Exception MessagesProgress Value Determination and Display of Exception MessagesEnd Level 3 Node: Progress Value Determination and Display of Exception Messages
      Start Level 3 Node: Functions in the Order Progress ReportFunctions in the Order Progress ReportEnd Level 3 Node: Functions in the Order Progress Report
         Start Level 4 Node: Calling the Order Progress ReportCalling the Order Progress ReportEnd Level 4 Node: Calling the Order Progress Report
   Start Level 2 Node: Assembly OrdersAssembly OrdersEnd Level 2 Node: Assembly Orders
   Start Level 2 Node: Order SplitOrder SplitEnd Level 2 Node: Order Split
   Start Level 2 Node: Operations/Components Not Relevant to MRPOperations/Components Not Relevant to MRPEnd Level 2 Node: Operations/Components Not Relevant to MRP
      Start Level 3 Node: Activate Purchase Requisition/ReservationActivate Purchase Requisition/ReservationEnd Level 3 Node: Activate Purchase Requisition/Reservation
   Start Level 2 Node: Product Cost CollectorProduct Cost CollectorEnd Level 2 Node: Product Cost Collector
   Start Level 2 Node: Work-in-Process (WIP) BatchWork-in-Process (WIP) BatchEnd Level 2 Node: Work-in-Process (WIP) Batch