Show TOC

 Editing Base Planning Objects in the Worklist Locate this document in the navigation structure

Prerequisites

You can generate a list of base planning objects containing errors and edit them directly from the list.

Procedure

  1. Choose   Accounting   Controlling   Product Cost Controlling   Product Cost Planning   Reference and Simulation Costing   Revaluate Base Planning Objects   .  

  2. The screen Revaluate Base Planning Objects appears.

  3. Choose Process worklist.

  4. The screen Evaluate application log appears.

  5. Check the selection criteria, such as:

  • Object COUC (unit cost estimate/base planning object)

  • Sub-object BO_REV (revaluate base planning objects)

  • User

  1. Choose  ( ) .

Result

The screen Display Logs appears containing a list of the selected logs.

  • If you place the cursor on a line and choose Detail , you can select the base planning objects that have not been revaluated an revaluate them by choosing Transfer .

  • If you place the cursor on a line and choose Display logs and then View: All Messages , the system displays a list of all the messages in a log.

  • On lines flagged by the system as very important , you can change the base planning object by choosing Detail .

  • On lines flagged by the system as important , you can revaluate the base planning object by choosing Detail .

See also:

Displaying Logs

Analyzing Logs

Deleting Logs