Show TOC

 Material Overview Locate this document in the navigation structure

Definition

Overview of the materials that were selected or costed.

Use

You can display the material overview in accordance with the following:

Structure

The following information is displayed for each material:

  • Costing status

  • Material and plant

  • Costing level

  • Number of system messages

  • Costing lot size and unit of measure

  • Material component indicator

  • If this indicator is set, the material was included in the cost estimate as a material component (without its own BOM).

  • If this indicator is not set, the material was included in the cost estimate as an assembly (with its own BOM).

  • Description of material

If the material has already been costed with a quantity structure or within a costing run, you can go to the cost estimate by double-clicking on the material. For more information, see Analyzing the Results .