To call up Report Painter reports in the relevant component of Controlling, choose:
or Activity-Based Costing etc. and then the desired report.
The selection screen described in Executing Report Painter Reports appears. The report parameters activated during report execution will be incorporated in the background processing.
2. Enter the report parameters in the selection screen.
3. To execute the report immediately in a background job, choose
.4. Enter the following information in the Print Parameters screen:
a) The name of the output device
b) The number of copies
c) If necessary, the spool information and output format
6. Choose Save .
The system executes the report in the background.