 Period-Based Information System Locate this document in the navigation structure

Use

In order to avoid runtime performance problems during periods of high use, the period-based information system allows you to start reports during periods of lower use at predefined times. In this way you can avoid system capacity problems during peak use periods.

Features

In contrast to the interactive information system, the period-based information system combines several processing steps and performs them without user intervention. You need to define a background job for this. The background job carries out all processing steps necessary to produce reports at a set time or periodically at set intervals. As the user, you initiate report processing by indicating a starting time. The SAP system then performs all further steps without further instructions.

This is particularly useful if you know you need extensive, current datasets at predefined times for evaluation.