 Maintenance of the Operation Overview Locate this document in the navigation structure

Use

The operations taken from the routing and scheduled for the order are listed on the operation overview. You can maintain this data here.

Features

The following information is listed for each operation on this screen:

  • The operation number (this number specifies the sequence in which operations are processed).

  • The suboperation number of existing suboperations

  • The work center where the operation is to be carried out

  • The control key that determines how the operation is to be used (for example, whether it must be confirmed, whether it can be scheduled, whether it can be printed, and so on)

  • The current status of the operation (for example, whether it has already been created or released)

  • The start and finish date of the operation

  • A short description of the operation

  • If XSteps have been created for operations in the routing, you can invoke them via the XStep editor.

In addition, there are the columns COMP , PRT and TPT :

  • If the indicator in the COMP column is set, material components are assigned to the operation.

  • If the indicator in the PRT column is set, production resources/tools are assigned to the operation.

  • If the indicator in the TPT column is set, trigger points are assigned to the operation.