 Process Operation/Suboperation Locate this document in the navigation structure

Prerequisites

The following data has been created in the system:

  • The general routing header data.

  • The work centers at which the operations and suboperations are to be carried out

  • If necessary, standard texts that you can adopt in the long texts of operations and suboperations

Procedure

  1. Call up the operation overview.

  2. Enter the data for the operations and suboperations on the operation overview.

    In the following table you can see:

    – Which fields are relevant to operations and which to suboperations

    – Which fields are liable to be prepopulated with a default value

    Field

    For operation

    for suboperation

    Default from

    Operation (operation number)

    X

    X

    Planning profile

    SOp (suboperation)

    X

    Work center

    X

    X

    Plant

    X

    X

    Routing header

    Control key

    X

    X

    Work center

    Standard text key

    X

    X

    Work center

    Description

    X

    X

    Object deps (Object dependencies)

    X

    X

    Long text exists

    X

    X

    Classification

    X

    Cumul(ation) type

    X

    Suboper do not apply to order

    X

    Base quantity

    X

    X

    Unit (for operation)

    X

    X

    Routing header

    Standard value

    X

    X

    Unit

    X

    X

    Work center

    Activity type

    X

    X

    Scrap

    X

    X

    User field key

    X

    X

    Referenced task list group

    X

    X

    Referenced task list

    Referenced group counter

    X

    X

    Referenced task list

    You can change each of these default values in the routing unless the reference indicator has been set for the default value in the work center. If necessary you can also change the planning profile in the routing.

  3. You can assign execution steps (XSteps) to the operations to describe the concrete execution (see Assign XSteps in the Application ).

    For more information on XSteps, refer to XSteps in Shop Floor Control .

  4. Save the routing.

    The system saves the routing.

    Caution Caution

    If you have not entered data that - according to the input rule - should or must be entered in the work center for an operation or suboperation, the Check Operation screen automatically appears. In this case, enter the necessary data and choose Continue . The system will then save the routing.

    End of the caution.