Show TOC

 Assigning Processes Locate this document in the navigation structure

Prerequisites

If you want to use CAPP standard values calculation, you must assign at least one process with which the standard values should be calculated to the work center.

Procedure

  1. In the Technical data screen of work center maintenance choose   Extras   Process assignment.  

  2. Set the Std indicator (standard indicator) if the process should be used for automatic standard value calculation.