You use this function if you also want to post the lot-size-independent costs when posting a goods receipt confirmation. Lot-size-independent costs can be either setup costs or costs of lot-size-independent materials. In repetitive manufacturing, setup costs and fixed quantities do not normally occur with every production lot. As a rule, they are incurred at the start of a new production series, for example.
The system determines the lot-size-independent costs from the lot-size-independent component quantities in the BOM, and the setup costs from the operation times in the routing.
On the initial screen for the confirmation, choose Details .
Select the Lot-Size-Independent Costs indicator and choose Adopt.
Note
You must reselect the indicator for each goods receipt confirmation if you want to post the lot-size-independent costs.