Show TOC

 Executing Batch Determination Locate this document in the navigation structure

  1. Branch to the component overview screen.

  2. Select the material component for which you want to execute batch determination and choose   Component   Batch management   Trigger batch determination.  

The system lists all batches that meet the selection criteria and that have available stock on the requirements date.

You can change the proposed assignment of the requirement quantity any way you want.

Note Note

If the system cannot select any batches using the selection criteria entered, you can switch off the selection criteria off by choosing   Batch determination   W/o class selection.  

End of the note.
  1. Choose  ( ) .