 Graphical Display Locate this document in the navigation structure

Use

You can display the data from the various evaluation lists in the capacity evaluation using the SAP presentation graphic.

You can also use the SAP Gantt chart Operation/Work Cntr. to obtain an overview of the dates of operations at a work center.

Prerequisites

You define the settings for the layout of data for the various graphics in the graphics profile. You specify whether the system displays the data for the standard overview as blocks, bars or lines.

During the capacity evaluation you can at any time

Features

General Functions in the SAP Presentation Graphic

In the SAP presentation graphic the data from the evaluation lists is displayed in two dimensions, three dimensions or as an overview.

Graphic for Standard Overview

This graphic displays the capacity situation of capacities from the standard overview. A maximum of 32 capacities can be displayed in this graphic. The graphic cannot be generated for more than 32 capacities. A diagram can comprise a maximum of 32 periods, any other periods are cut off.

In the standard overview you can select capacities for the graphic by marking periods for the relevant capacities. In this way you also determine the display period in the diagrams. If you do not select any periods in the standard overview then (within the above restrictions) the diagrams for all the capacities are generated for all the periods.

Graphic for Detailed Capacity List

In this graphic, for any selected capacity, in the detailed capacity list you can see the capacity requirements in every period listed according to the pegged requirements. In the overview display you can choose between the different views. The following are displayed:

  • Capacity requirements of all pegged requirements for all periods

  • Capacity requirements for all pegged requirements for a selected period

  • Capacity requirements for one pegged requirement for all periods

To do this click on one front side ( periods or orders ) of the 3D diagram and select an appropriate entry from the list. If you double-click on a bar in the 2D diagram in the overview the system displays detailed information.

Graphic for Variable Overview

This graphic shows the values for the various columns in the variable overview. In the overview display you can choose between various views (as with the detailed capacity list). As with the standard overview a diagram can display a maximum of 32 periods; any other periods are cut off.

“Operations/Work Center” Graphic

This graphic shows the operations at a work center as bars in an adjustable period split. A dotted vertical line marks today’s date. In the graphics profile and in the capacity evaluation you can specify:

  • Which dates or durations are displayed for the operations

    • Earliest or latest start and finish dates

    • Actual start and actual finish date (for partially confirmed operations)

  • Whether the times for the operation segments or the overall execution times are displayed

  • How the operations in the diagram are sorted (for example, by material number, earliest start)

The bars for the operations have titles

  • With the material number if there is a material for the order

  • With the order description if there is no material for the order

  • With the order number if there is neither a material nor an order description for the order.

If you double-click on an operation bar the system displays detailed information on the order.

Activities

You can call up the desired graphic with   Goto   Graphic.  

Note Note

You can only call up the graphic for the detailed capacity list from the detailed capacity list.

End of the note.