Show TOC

 Marking Prices for Future Valuation Locate this document in the navigation structure

Prerequisites

  • You have performed single-level or multilevel price determination.

  • You have checked the new prices from material price determination. The prices with price control indicator V come from the current period's price determination. You want to use these prices as valuation prices in the following period (price control indicator S).

  • Closing entries were performed

Procedure

  1. Under Process and Mark Material Prices choose Parameters.

  2. Determine when the system should mark the prices. Enter data as required.

  3. Choose the method of processing. You can perform the function in the background.

  4. Choose Execute .

Result

The prices are marked as future valuation prices for the materials in the costing run.

Next, you can do the following:

  1. Change the prices manually

  2. For more information, see Determining Future Prices .

  3. Release the planned prices

For more information, see Releasing Planned Prices .