Show TOC

Process documentationSetting Up Statistical Process Control (SPC) Locate this document in the navigation structure

 

You use this process to set up SPC in order to perform SPC analysis of collected data (see Statistical Process Control (SPC)).

When you set up SPC, you decide the following:

  • What SPC chart types you want to see

  • What labels you want to display for control chart axes

  • What specification and control limits you want to define for secondary charts

  • What axes labels for control charts you want to maintain

    Note Note

    Not all chart types require secondary specification and control limits

    End of the note.
  • What SPC message type you want to assign to SPC trend rules

  • When SPC analysis is performed and then displayed in the POD

Prerequisites

  • You have installed the Statit e-Server software on an SPC server.

  • You have installed and started SAP ME SPC Server software on an SPC server.

    For more information, see SAP ME Installation Guide.

Process

  1. In System Rule Maintenance, you specify the Statit Server Host Computer Name (see Miscellaneous Rules).

  2. In SPC Chart Maintenance, you define control charts that you use for SPC analysis (see SPC Chart Maintenance).

  3. In SPC Alarm Severity Maintenance, you assign an SPC message type to required SPC trend rules (see SPC Alarm Severity Maintenance).

  4. In Message Type Maintenance, you verify that the following SPC message types are not disabled:

    • SPC_ALARM_WARNING

    • SPC_ALARM_VIOLATION

  5. In Data Collection Maintenance, you complete fields on the SPC tab page of the Parameter Detail screen for required data parameters of the defined DC groups.

    For more information, see Data Collection Maintenance.